If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0746093106000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.45357,"lon":-119.37278,"icon":""}]} |
Location: 00/06-31-074-09W6/0 | |
Location Alias: 00/06-31-74-09 W6M | |
Location Alias 2: 00/06-31-074-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 074 | |
Meridian: 6 | |
Range: 09 | |
Section: 31 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: TIDEWATER VALHALLA 6-31-74-9 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0101230 | |
License Date: 1983-04-29 | |
License Status: Issued | |
Spud Date: 1983-05-07 | |
Final Drill Date: 1983-05-29 | |
Well Total Depth: 2130.00 m | |
Surface Hole Latitude: 55.453570 | |
Surface Hole Longitude: -119.372780 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-04-29 | Obtained License |
1983-05-12 | Drill Stem Test Performed |
1983-05-13 | Drill Stem Test Performed |
1983-05-19 | Drill Stem Test Performed |
1983-05-25 | Drill Stem Test Performed |
1983-05-26 | Drill Stem Test Performed |
1983-05-29 | Finished Drilling |
1983-05-29 | Well Log Performed |
1983-05-29 | Well Mode changed to Drilled and Cased |
1983-05-30 | Drill Stem Test Performed |
1983-05-31 | Drill Stem Test Performed |
1983-06-02 | Production Casing Operation Performed |
1983-06-19 | Perforation Treatment Performed - Jet Perforation |
1983-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-06-26 | Perforation Treatment Performed - Jet Perforation |
1983-06-27 | Perforation Treatment Performed - Fractured |
1983-06-29 | Well Began Production |
1983-06-29 | Well Fluid changed to Crude Oil |
1983-06-29 | Well Mode changed to Flowing |
1986-10-01 | Well Fluid changed to Crude Oil |
1986-10-01 | Well Mode changed to Suspended |
1995-01-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-01-31 | Perforation Treatment Performed - Jet Perforation |
1995-01-31 | Plug Back Performed |
1995-01-31 | Well Fluid changed to Crude Oil |
1995-01-31 | Well Mode changed to Abandoned Zone |
1996-01-27 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-06-19 | Perforation | 2088.50 | 2091.50 | 13 |
1983-06-25 | Packing Device Capped w/Cement | 2081.50 | 2085.00 | 0 |
1983-06-26 | Perforation | 1973.00 | 1978.50 | 7 |
1983-06-27 | Fracture | 1973.00 | 1978.50 | 0 |
1995-01-31 | Packing Device Capped w/Cement | 1950.00 | 1958.00 | 0 |
1995-01-31 | Perforation | 1615.00 | 1618.00 | 13 |
1996-01-27 | Fracture | 1615.00 | 1618.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 1601 | 0.0 | 0.0 | 0.0 |
1984 | 1790 | 0.0 | 0.0 | 0.0 |
1985 | 3169 | 0.0 | 0.0 | 0.0 |
For data sources see[5]