X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0746093211000

Well Details

Well ID: 0746093211000
Loading map...
Location: 00/11-32-074-09W6/0
Location Alias: 00/11-32-74-09 W6M
Location Alias 2: 00/11-32-074-09 W6/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 6
Range: 09
Section: 32
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER VALHALLA 11-32-74-9
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0138428
License Date: 1989-01-26
License Status: Abandoned
Spud Date: 1989-02-13
Final Drill Date: 1989-02-16
Well Total Depth: 716.00 m
Surface Hole Latitude: 55.457259
Surface Hole Longitude: -119.347776

For data sources see[1][2]

Well History

Date Event
1989-01-26 Obtained License
1989-02-14 Surface Casing Operation Performed
1989-02-16 Finished Drilling
1989-02-16 Well Log Performed
1989-02-16 Well Mode changed to Drilled and Cased
1989-02-18 Production Casing Operation Performed
1989-02-18 Rig Released
1989-03-24 Well Log Performed
1989-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-27 Perforation Treatment Performed - Jet Perforation
1989-03-28 Well Log Performed
1990-01-01 Well Began Injection
1990-01-01 Well Fluid changed to Water
1990-01-01 Well Type changed to Injection
1996-09-15 Perforation Treatment Performed - Chemical Squeeze
2006-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-30 Plug Back Performed
2006-08-30 Well Fluid changed to Water
2006-08-30 Well Mode changed to Abandoned Zone
2006-08-30 Well Type changed to Injection
2006-10-02 Well Abandoned
2006-10-02 Well Fluid changed to Water
2006-10-02 Well Mode changed to Abandoned
2006-10-02 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-03-27 Perforation 695.60 699.60 13
1989-03-27 Acid Treatment 695.60 699.60 0
1996-09-15 Chemical Squeeze 695.60 699.60 0
2006-08-30 Packing Device Capped w/Cement 678.00 686.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0

For data sources see[5]

References