X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0754142911002

Well Details

Well ID: 0754142911002
Loading map...
Location: 00/11-29-075-14W4/2
Location Alias: 00/11-29-75-14 W4M
Location Alias 2: 00/11-29-075-14 W4/02
Country: Canada
Province: Alberta
Township: 075
Meridian: 4
Range: 14
Section: 29
County/Municipality: Lac La Biche County
Well Name: BVX ET AL DUNCAN 11-29-75-14
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0087712
License Date: 1980-12-17
License Status: RecCertified
Spud Date: 1981-01-13
Final Drill Date: 1981-01-17
Well Total Depth: 587.00 m
Surface Hole Latitude: 55.529760
Surface Hole Longitude: -112.144049

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-12-17 Obtained License
1981-01-17 Finished Drilling
1981-01-17 Well Mode changed to Drilled and Cased
1981-01-18 Drill Stem Test Performed
1981-01-19 Production Casing Operation Performed
1981-01-27 Perforation Treatment Performed - Open-Hole Completion
1991-01-07 Well Log Performed
1992-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-02-21 Plug Back Performed
1992-02-22 Perforation Treatment Performed - Jet Perforation
1992-02-22 Well Log Performed
1992-02-29 Well Began Production
1992-02-29 Well Fluid changed to Gas
1992-02-29 Well Mode changed to Flowing
1993-02-07 Well Log Performed
1998-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-18 Plug Back Performed
1998-01-18 Well Fluid changed to Gas
1998-01-18 Well Log Performed
1998-01-18 Well Mode changed to Abandoned Zone
1998-01-27 Well Abandoned
1998-01-27 Well Fluid changed to Gas
1998-01-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-27 Open Hole/Barefoot Completion 574.00 587.00 0
1992-02-21 Packing Device Capped w/Cement 562.00 570.00 0
1992-02-22 Perforation 377.00 377.50 13
1992-02-22 Perforation 378.10 378.90 13
1992-02-22 Perforation 385.00 386.00 13
1998-01-18 Packing Device Capped w/Cement 355.50 363.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 2125 0.0 0.0 0.0
1993 1587 0.0 0.0 0.0

For data sources see[5]

References