X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0754152607000

Well Details

Well ID: 0754152607000
Loading map...
Location: 00/07-26-075-15W4/0
Location Alias: 00/07-26-75-15 W4M
Location Alias 2: 00/07-26-075-15 W4/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 4
Range: 15
Section: 26
County/Municipality: Lac La Biche County
Well Name: BVX ET AL DUNCAN 7-26-75-15
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0056263
License Date: 1975-12-16
License Status: RecCertified
Spud Date: 1976-02-17
Final Drill Date: 1976-02-20
Well Total Depth: 601.40 m
Surface Hole Latitude: 55.525780
Surface Hole Longitude: -112.216995

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-12-16 Obtained License
1976-02-20 Drill Stem Test Performed
1976-02-20 Finished Drilling
1976-02-21 Production Casing Operation Performed
1976-03-04 Perforation Treatment Performed - Open-Hole Completion
1976-03-05 Perforation Treatment Performed - Cement Plug
1976-03-07 Perforation Treatment Performed - Open-Hole Completion
1976-12-01 Well Mode changed to Drilled and Cased
1978-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-09 Well Began Production
1978-03-09 Well Fluid changed to Gas
1978-03-09 Well Mode changed to Flowing
1988-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-02-23 Perforation Treatment Performed - Jet Perforation
1988-02-23 Plug Back Performed
1988-02-23 Well Fluid changed to Gas
1988-02-23 Well Mode changed to Abandoned Zone
1998-01-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-14 Plug Back Performed
1998-01-14 Well Log Performed
1998-01-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-03-04 Open Hole/Barefoot Completion 589.20 595.30 0
1976-03-05 Cement Plug 586.10 595.30 0
1976-03-07 Open Hole/Barefoot Completion 589.20 601.40 0
1978-03-01 Acid Treatment 589.20 601.40 0
1988-02-23 Packing Device Capped w/Cement 584.30 587.30 0
1988-02-23 Perforation 581.90 583.40 13
1998-01-14 Packing Device Capped w/Cement 540.20 574.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 5642 0.0 0.0 0.0
1979 5427 0.0 0.0 0.0
1980 5739 0.0 0.0 0.0
1981 8687 0.0 0.0 0.0
1982 6653 0.0 0.0 0.0
1983 7801 0.0 0.0 0.0
1984 8276 0.0 0.0 0.0
1985 5318 0.0 0.0 0.0
1986 1171 0.0 0.0 0.0
1987 327 0.0 0.0 0.0

For data sources see[5]

References