If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0754251007002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.487085,"lon":-113.759899,"icon":""}]} |
Location: 00/07-10-075-25W4/2 | |
Location Alias: 00/07-10-75-25 W4M | |
Location Alias 2: 00/07-10-075-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 4 | |
Range: 25 | |
Section: 10 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: DELTASTREAM HZ MARTENH 7-10-75-25 | |
Operator Name: Deltastream Energy Corporation | |
License Number: 0482920 | |
License Date: 2017-02-16 | |
License Status: Amended | |
Spud Date: 2017-03-05 | |
Final Drill Date: 2017-03-18 | |
Well Total Depth: 2791.00 m | |
Surface Hole Latitude: 55.487085 | |
Surface Hole Longitude: -113.759899 |
Date | Event |
---|---|
2017-02-16 | Obtained License |
2017-03-06 | Surface Casing Operation Performed |
2017-03-12 | Direction Drilling Operation Performed - Horizontal |
2017-03-13 | Well Log Performed |
2017-03-14 | Intermediate Casing Operation Performed |
2017-03-18 | Finished Drilling |
2017-03-18 | Well Log Performed |
2017-03-18 | Well Mode changed to Drilled and Cased |
2017-03-31 | Perforation Treatment Performed - Open-Hole Completion |
2017-04-01 | Rig Released |
2017-06-01 | Well Began Production |
2017-06-01 | Well Fluid changed to Crude Bitumen |
2017-06-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2017-03-12 | 243.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-03-31 | Open Hole/Barefoot Completion | 902.00 | 2791.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 5050 | 0.0 | 0.0 | 0.0 |
2018 | 6572 | 0.0 | 0.0 | 0.0 |
2019 | 8128 | 0.0 | 0.0 | 0.0 |
2020 | 2016 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-03-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]