If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0754262604024 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.523677,"lon":-113.908967,"icon":""}]} |
Location: 02/04-26-075-26W4/4 | |
Location Alias: 02/04-26-75-26 W4M | |
Location Alias 2: 02/04-26-075-26 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 4 | |
Range: 26 | |
Section: 26 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: DELTASTREAM N HZ MARTENH 4-26-75-26 | |
Operator Name: Deltastream Energy Corporation | |
License Number: 0493686 | |
License Date: 2019-02-05 | |
License Status: Amended | |
Spud Date: 2019-03-14 | |
Final Drill Date: 2019-03-21 | |
Well Total Depth: 2202.00 m | |
Surface Hole Latitude: 55.523677 | |
Surface Hole Longitude: -113.908967 |
Date | Event |
---|---|
2019-02-05 | Obtained License |
2019-03-15 | Direction Drilling Operation Performed - Deviate |
2019-03-15 | Surface Casing Operation Performed |
2019-03-16 | Direction Drilling Operation Performed - Horizontal |
2019-03-17 | Intermediate Casing Operation Performed |
2019-03-19 | Direction Drilling Operation Performed - Horizontal |
2019-03-20 | Direction Drilling Operation Performed - Horizontal |
2019-03-21 | Finished Drilling |
2019-03-21 | Perforation Treatment Performed - Open-Hole Completion |
2019-03-21 | Well Log Performed |
2019-03-21 | Well Structure changed to Drain |
2019-03-26 | Rig Released |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2019-03-15 | 423.80 | Deviate (5 - 79 degrees) |
2019-03-16 | 836.40 | Horizontal |
2019-03-19 | 955.00 | Horizontal |
2019-03-20 | 993.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-03-21 | Open Hole/Barefoot Completion | 993.00 | 2202.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-03-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]