X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0755010409000

Well Details

Well ID: 0755010409000
Loading map...
Location: 00/09-04-075-01W5/0
Location Alias: 00/09-04-75-01 W5M
Location Alias 2: 00/09-04-075-01 W5/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 5
Range: 01
Section: 04
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: DELTASTREAM MARTENH 9-4-75-1
Operator Name: Deltastream Energy Corporation
License Number: 0147103
License Date: 1990-12-21
License Status: Suspension
Spud Date: 1991-01-09
Final Drill Date: 1991-01-13
Well Total Depth: 640.20 m
Surface Hole Latitude: 55.470751
Surface Hole Longitude: -114.084674

For data sources see[1][2]

Well History

Date Event
1990-12-21 Obtained License
1991-01-11 Surface Casing Operation Performed
1991-01-13 Finished Drilling
1991-01-13 Well Log Performed
1991-01-14 Drill Stem Test Performed
1991-01-15 Production Casing Operation Performed
1991-01-15 Rig Released
1991-02-07 Perforation Treatment Performed - Open-Hole Completion
1991-02-08 Well Log Performed
1991-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-02-12 Perforation Treatment Performed - Jet Perforation
1991-02-12 Plug Back Performed
1991-02-15 Well Mode changed to Drilled and Cased
1991-12-23 Well Began Production
1991-12-23 Well Fluid changed to Gas
1991-12-23 Well Mode changed to Flowing
1999-12-21 Perforation Treatment Performed - Jet Perforation
1999-12-21 Well Fluid changed to Gas
1999-12-21 Well Mode changed to Flowing
2001-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-09 Perforation Treatment Performed - Jet Perforation
2001-03-09 Plug Back Performed
2001-03-09 Well Log Performed
2011-07-08 Well Fluid changed to Gas
2011-07-08 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-02-07 Open Hole/Barefoot Completion 625.00 640.20 0
1991-02-10 Acid Treatment 625.00 640.20 0
1991-02-11 Packing Device Capped w/Cement 620.00 628.00 0
1991-02-12 Perforation 454.00 458.00 10
1999-12-21 Perforation 546.50 547.50 13
2001-03-09 Packing Device Capped w/Cement 532.00 540.00 0
2001-03-09 Perforation 482.00 483.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 214 0.0 0.0 0.0
1992 7959 0.0 0.0 0.0
1993 8420 0.0 0.0 0.0
1994 8303 0.0 0.0 0.0
1995 8575 0.0 0.0 0.0
1996 8702 0.0 0.0 0.0
1997 8140 0.0 0.0 0.0
1998 8412 0.0 0.0 0.0
1999 6094 0.0 0.0 0.0
2000 5179 0.0 0.0 0.0
2001 8332 0.0 0.0 0.0
2002 1622 0.0 0.0 0.0
2003 7655 0.0 0.0 0.0
2004 2523 0.0 0.0 0.0
2005 360 0.0 0.0 0.0
2006 8624 0.0 0.0 0.0
2007 8064 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 7279 0.0 0.0 0.0
2011 3575 0.0 0.0 0.0

For data sources see[5]

References