X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0755013505005

Well Details

Well ID: 0755013505005
Loading map...
Location: 00/05-35-075-01W5/5
Location Alias: 00/05-35-75-01 W5M
Location Alias 2: 00/05-35-075-01 W5/05
Country: Canada
Province: Alberta
Township: 075
Meridian: 5
Range: 01
Section: 35
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: DELTASTREAM MARTENH 5-35-75-1
Operator Name: Deltastream Energy Corporation
License Number: 0205864
License Date: 1997-09-09
License Status: Abandoned
Spud Date: 1998-01-16
Final Drill Date: 1998-01-23
Well Total Depth: 770.00 m
Surface Hole Latitude: 55.539040
Surface Hole Longitude: -114.049988

For data sources see[1][2]

Well History

Date Event
1997-09-09 Obtained License
1998-01-16 Surface Casing Operation Performed
1998-01-18 Well Log Performed
1998-01-19 Production Casing Operation Performed
1998-01-19 Rig Released
1998-01-23 Finished Drilling
1998-01-23 Perforation Treatment Performed - Open-Hole Completion
1998-01-23 Well Mode changed to Drilled and Cased
1998-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-24 Perforation Treatment Performed - Jet Perforation
1998-01-24 Plug Back Performed
1998-01-24 Well Log Performed
2003-12-15 Perforation Treatment Performed - Jet Perforation
2003-12-16 Well Log Performed
2005-01-21 Perforation Treatment Performed - Cement Plug
2005-01-21 Well Log Performed
2005-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-22 Plug Back Performed
2005-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-23 Perforation Treatment Performed - Jet Perforation
2005-01-23 Plug Back Performed
2005-01-23 Well Log Performed
2005-01-31 Well Fluid changed to Gas
2005-01-31 Well Mode changed to Testing
2009-01-19 Perforation Treatment Performed - Cement Squeeze
2009-01-19 Plug Back Performed
2009-01-26 Perforation Treatment Performed - Jet Perforation
2009-01-26 Well Log Performed
2009-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-11 Plug Back Performed
2009-02-11 Well Fluid changed to Gas
2009-02-11 Well Mode changed to Abandoned Zone
2009-02-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-01-23 Open Hole/Barefoot Completion 768.00 770.00 0
2005-01-23 Perforation 547.00 549.20 17
2009-01-19 Cement Squeeze 547.00 549.20 0
2009-01-26 Perforation 583.00 585.00 2
2009-02-11 Packing Device Capped w/Cement 500.00 614.00 0
1998-01-24 Packing Device Capped w/Cement 749.00 765.00 0
1998-01-24 Perforation 636.00 638.00 14
1998-01-24 Perforation 638.00 639.00 14
1998-01-24 Perforation 618.00 620.50 14
2003-12-15 Perforation 712.00 714.50 17
2005-01-21 Cement Plug 714.00 758.50 0
2005-01-22 Packing Device Capped w/Cement 639.00 707.00 0
2005-01-23 Packing Device Capped w/Cement 621.00 634.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 48 0.0 0.0 0.0

For data sources see[5]

References