If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0755203212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.545256,"lon":-117.051871,"icon":""}]} |
Location: 00/12-32-075-20W5/0 | |
Location Alias: 00/12-32-75-20 W5M | |
Location Alias 2: 00/12-32-075-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 5 | |
Range: 20 | |
Section: 32 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: LONG RUN HZ GVILLEE 12-32-75-20 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0448722 | |
License Date: 2012-09-26 | |
License Status: Issued | |
Spud Date: 2012-10-10 | |
Final Drill Date: 2012-10-18 | |
Well Total Depth: 2574.00 m | |
Surface Hole Latitude: 55.545256 | |
Surface Hole Longitude: -117.051871 |
Date | Event |
---|---|
2012-09-26 | Obtained License |
2012-10-10 | Surface Casing Operation Performed |
2012-10-12 | Direction Drilling Operation Performed - Deviate |
2012-10-13 | Direction Drilling Operation Performed - Horizontal |
2012-10-13 | Well Log Performed |
2012-10-14 | Intermediate Casing Operation Performed |
2012-10-14 | Well Log Performed |
2012-10-18 | Finished Drilling |
2012-10-18 | Well Mode changed to Drilled and Cased |
2012-10-19 | Well Log Performed |
2012-10-20 | Liner Casing Operation Performed |
2012-10-20 | Rig Released |
2012-10-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-14 | Well Began Production |
2012-11-14 | Well Fluid changed to Crude Oil |
2012-11-14 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-10-10 | Trinidad Drilling Ltd. | 24 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-10-12 | 687.20 | Deviate (5 - 79 degrees) |
2012-10-13 | 1188.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-29 | Multi-Stage Fracture | 2548.80 | 2548.90 | 0 |
2012-10-29 | Multi-Stage Fracture | 2099.00 | 2099.10 | 0 |
2012-10-29 | Multi-Stage Fracture | 2049.00 | 2049.10 | 0 |
2012-10-29 | Multi-Stage Fracture | 1999.00 | 1999.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 1949.00 | 1949.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 1905.00 | 1905.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 1864.00 | 1864.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 1802.00 | 1802.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 1762.00 | 1762.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 1712.00 | 1712.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 1662.00 | 1662.10 | 0 |
2012-10-29 | Multi-Stage Fracture | 2499.00 | 2499.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 1622.00 | 1622.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 1582.00 | 1582.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 1528.00 | 1528.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 1478.00 | 1478.10 | 0 |
2012-10-30 | Multi-Stage Fracture | 1425.20 | 1425.30 | 0 |
2012-10-30 | Multi-Stage Fracture | 1378.00 | 1378.10 | 0 |
2012-10-29 | Multi-Stage Fracture | 2449.00 | 2449.10 | 0 |
2012-10-29 | Multi-Stage Fracture | 2399.00 | 2399.10 | 0 |
2012-10-29 | Multi-Stage Fracture | 2346.50 | 2346.60 | 0 |
2012-10-29 | Multi-Stage Fracture | 2299.00 | 2299.10 | 0 |
2012-10-29 | Multi-Stage Fracture | 2249.00 | 2249.10 | 0 |
2012-10-29 | Multi-Stage Fracture | 2199.00 | 2199.10 | 0 |
2012-10-29 | Multi-Stage Fracture | 2149.00 | 2149.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1126 | 0.0 | 0.0 | 0.0 |
2013 | 8275 | 0.0 | 0.0 | 0.0 |
2014 | 8668 | 0.0 | 0.0 | 0.0 |
2015 | 8538 | 0.0 | 0.0 | 0.0 |
2016 | 7944 | 0.0 | 0.0 | 0.0 |
2017 | 8454 | 0.0 | 0.0 | 0.0 |
2018 | 8715 | 0.0 | 0.0 | 0.0 |
2019 | 8635 | 0.0 | 0.0 | 0.0 |
2020 | 2158 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-20 | No Incident Encountered | 0.00 | 0.00 |
2012-11-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]