If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0755223214000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.547719,"lon":-117.379082,"icon":""}]} |
Location: 00/14-32-075-22W5/0 | |
Location Alias: 00/14-32-75-22 W5M | |
Location Alias 2: 00/14-32-075-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 5 | |
Range: 22 | |
Section: 32 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: DEVON MCLEANSC 14-32-75-22 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0137135 | |
License Date: 1988-10-24 | |
License Status: Suspension | |
Spud Date: 1988-10-31 | |
Final Drill Date: 1988-11-26 | |
Well Total Depth: 2558.00 m | |
Surface Hole Latitude: 55.547719 | |
Surface Hole Longitude: -117.379082 |
Date | Event |
---|---|
1988-10-24 | Obtained License |
1988-11-01 | Surface Casing Operation Performed |
1988-11-04 | Kick Occurred |
1988-11-05 | Drill Stem Test Performed |
1988-11-24 | Kick Occurred |
1988-11-26 | Finished Drilling |
1988-11-27 | Well Log Performed |
1988-11-28 | Drill Stem Test Performed |
1988-11-28 | Well Log Performed |
1988-11-30 | Production Casing Operation Performed |
1988-11-30 | Rig Released |
1989-03-01 | Perforation Treatment Performed - Jet Perforation |
1989-03-05 | Perforation Treatment Performed - Jet Perforation |
1989-06-17 | Perforation Treatment Performed - Jet Perforation |
1989-07-04 | Well Mode changed to Drilled and Cased |
2000-06-13 | Well Began Production |
2000-06-13 | Well Fluid changed to Gas |
2000-06-13 | Well Mode changed to Flowing |
2000-07-28 | Well Log Performed |
2000-07-31 | Well Log Performed |
2001-07-10 | Well Fluid changed to Gas |
2001-07-10 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-03-01 | Perforation | 2526.50 | 2528.80 | 19 |
1989-03-05 | Perforation | 2517.00 | 2522.00 | 19 |
1989-06-17 | Perforation | 917.00 | 920.00 | 19 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 3219 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1988-11-04 | Kick | 940.00 | 940.00 |
1988-11-24 | Kick | 2530.00 | 2530.00 |
For data sources see[6]