X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756011708003

Well Details

Well ID: 0756011708003
Loading map...
Location: 00/08-17-075-01W6/3
Location Alias: 00/08-17-75-01 W6M
Location Alias 2: 00/08-17-075-01 W6/03
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 01
Section: 17
County/Municipality: Municipal District of Greenview No. 16
Well Name: CANHUNTER ET AL KAKUT 8-17-75-1
Operator Name: Shoreline Energy Corp.
License Number: 0276047
License Date: 2002-11-15
License Status: Abandoned
Spud Date: 2002-11-21
Final Drill Date: 2002-12-07
Well Total Depth: 2397.00 m
Surface Hole Latitude: 55.494478
Surface Hole Longitude: -118.109457

For data sources see[1][2]

Well History

Date Event
2002-11-15 Obtained License
2002-11-22 Surface Casing Operation Performed
2002-12-05 Drill Stem Test Performed
2002-12-07 Finished Drilling
2002-12-07 Well Log Performed
2002-12-07 Well Mode changed to Drilled and Cased
2002-12-08 Well Log Performed
2002-12-10 Drill Stem Test Performed
2002-12-11 Production Casing Operation Performed
2002-12-11 Rig Released
2002-12-14 Well Log Performed
2002-12-15 Perforation Treatment Performed - Jet Perforation
2002-12-15 Well Log Performed
2002-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-19 Perforation Treatment Performed - Jet Perforation
2002-12-19 Well Log Performed
2002-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-01-06 Perforation Treatment Performed - Jet Perforation
2003-01-06 Well Log Performed
2003-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-08 Well Log Performed
2003-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-07-12 Well Began Production
2003-07-12 Well Fluid changed to Gas
2003-07-12 Well Mode changed to Flowing
2016-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-11-27 Plug Back Performed
2016-11-27 Well Log Performed
2016-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-11-28 Plug Back Performed
2016-11-28 Well Fluid changed to Gas
2016-11-28 Well Log Performed
2016-11-28 Well Mode changed to Abandoned Zone
2016-11-29 Well Log Performed
2016-11-30 Well Abandoned
2016-11-30 Well Fluid changed to Gas
2016-11-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-12-15 Perforation 2221.00 2227.00 17
2002-12-16 Acid Treatment 2221.00 2227.00 0
2002-12-19 Perforation 2201.50 2205.00 17
2002-12-20 Acid Treatment 2201.50 2205.00 0
2003-01-06 Perforation 2153.00 2157.00 17
2003-01-07 Acid Treatment 2153.00 2157.00 0
2003-02-10 Acid Treatment 2153.00 2157.00 0
2016-11-27 Packing Device Capped w/Cement 2183.00 2191.00 0
2016-11-28 Packing Device Capped w/Cement 2133.00 2141.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 3759 0.0 0.0 0.0
2004 8466 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8322 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8350 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 7151 0.0 0.0 0.0

For data sources see[5]

References