If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0756041916002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.516196,"lon":-118.60055,"icon":""}]} |
Location: 00/16-19-075-04W6/2 | |
Location Alias: 00/16-19-75-04 W6M | |
Location Alias 2: 00/16-19-075-04 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 6 | |
Range: 04 | |
Section: 19 | |
County/Municipality: Birch Hills County | |
Well Name: ANDERSON ET AL WOKING 16-19-75-4 | |
Operator Name: Devon Canada Corporation | |
License Number: 0104534 | |
License Date: 1983-12-05 | |
License Status: RecCertified | |
Spud Date: 1983-12-08 | |
Final Drill Date: 1983-12-14 | |
Well Total Depth: 1700.00 m | |
Surface Hole Latitude: 55.516196 | |
Surface Hole Longitude: -118.600550 |
Date | Event |
---|---|
1983-12-05 | Obtained License |
1983-12-14 | Finished Drilling |
1983-12-14 | Well Mode changed to Drilled and Cased |
1983-12-15 | Well Log Performed |
1983-12-16 | Drill Stem Test Performed |
1983-12-17 | Drill Stem Test Performed |
1983-12-20 | Production Casing Operation Performed |
1984-01-22 | Well Log Performed |
1984-01-25 | Perforation Treatment Performed - Jet Perforation |
1984-01-29 | Perforation Treatment Performed - Jet Perforation |
1984-01-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-06-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-06-04 | Plug Back Performed |
1992-06-04 | Well Log Performed |
1992-06-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-06-05 | Perforation Treatment Performed - Jet Perforation |
1992-06-05 | Plug Back Performed |
1992-06-05 | Well Log Performed |
1992-06-06 | Perforation Treatment Performed - Jet Perforation |
1993-12-19 | Well Began Production |
1993-12-19 | Well Fluid changed to Gas |
1993-12-19 | Well Mode changed to Flowing |
1994-12-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-12-10 | Perforation Treatment Performed - Cement Squeeze |
1994-12-10 | Plug Back Performed |
1994-12-14 | Perforation Treatment Performed - Jet Perforation |
1994-12-14 | Well Fluid changed to Gas |
1994-12-14 | Well Log Performed |
1994-12-14 | Well Mode changed to Flowing |
1994-12-17 | Perforation Treatment Performed - Jet Perforation |
1994-12-17 | Well Log Performed |
1994-12-18 | Perforation Treatment Performed - Fractured |
1997-06-14 | Well Log Performed |
1997-06-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-06-15 | Perforation Treatment Performed - Jet Perforation |
1997-06-15 | Plug Back Performed |
1997-06-15 | Well Fluid changed to Gas |
1997-06-15 | Well Mode changed to Abandoned Zone |
1997-06-17 | Well Log Performed |
2000-06-19 | Perforation Treatment Performed - Cement Plug |
2000-06-19 | Plug Back Performed |
2000-06-20 | Perforation Treatment Performed - Jet Perforation |
2000-06-20 | Well Log Performed |
2000-06-21 | Perforation Treatment Performed - Cement Plug |
2000-06-21 | Perforation Treatment Performed - Remedial Casing |
2000-06-23 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-01-25 | Perforation | 1620.80 | 1621.80 | 8 |
1994-12-10 | Acid Treatment | 1011.00 | 1012.00 | 0 |
1994-12-10 | Cement Squeeze | 1011.00 | 1012.00 | 0 |
1994-12-14 | Perforation | 1165.00 | 1169.00 | 14 |
1994-12-17 | Perforation | 1165.00 | 1169.00 | 14 |
1994-12-17 | Perforation | 1068.00 | 1070.00 | 14 |
1994-12-18 | Fracture | 1165.00 | 1172.00 | 0 |
1997-06-15 | Packing Device Capped w/Cement | 1152.00 | 1160.00 | 0 |
1997-06-15 | Perforation | 1122.00 | 1127.00 | 18 |
2000-06-19 | Cement Plug | 800.00 | 1152.10 | 0 |
2000-06-20 | Perforation | 388.00 | 389.00 | 13 |
1984-01-29 | Perforation | 1620.80 | 1621.80 | 8 |
2000-06-21 | Remedial Casing Cementing | 388.00 | 389.00 | 0 |
2000-06-21 | Cement Plug | 354.00 | 404.00 | 0 |
1984-01-29 | Perforation | 1619.20 | 1620.00 | 8 |
1984-01-31 | Acid Treatment | 1619.20 | 1621.80 | 0 |
1992-06-04 | Packing Device Capped w/Cement | 1600.00 | 1608.00 | 0 |
1992-06-05 | Perforation | 1396.00 | 1398.50 | 13 |
1992-06-05 | Packing Device Capped w/Cement | 1382.00 | 1390.00 | 0 |
1992-06-06 | Perforation | 1011.00 | 1012.00 | 13 |
1992-06-06 | Perforation | 1068.00 | 1070.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 305 | 0.0 | 0.0 | 0.0 |
1994 | 7911 | 0.0 | 0.0 | 0.0 |
1995 | 167 | 0.0 | 0.0 | 0.0 |
For data sources see[5]