If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0756042906004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.525458,"lon":-118.587159,"icon":""}]} |
| Location: 00/06-29-075-04W6/4 | |
| Location Alias: 00/06-29-75-04 W6M | |
| Location Alias 2: 00/06-29-075-04 W6/04 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 075 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 29 | |
| County/Municipality: Birch Hills County | |
| Well Name: CNRL ET AL WOKING 6-29-75-4 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0095626 | |
| License Date: 1982-03-22 | |
| License Status: Abandoned | |
| Spud Date: 1982-03-25 | |
| Final Drill Date: 1982-04-17 | |
| Well Total Depth: 2101.00 m | |
| Surface Hole Latitude: 55.525458 | |
| Surface Hole Longitude: -118.587159 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1982-03-22 | Obtained License |
| 1982-03-26 | Lost Circulation Occurred |
| 1982-04-02 | Drill Stem Test Performed |
| 1982-04-17 | Finished Drilling |
| 1982-04-17 | Well Mode changed to Drilled and Cased |
| 1982-04-19 | Drill Stem Test Performed |
| 1982-04-21 | Drill Stem Test Performed |
| 1982-04-22 | Drill Stem Test Performed |
| 1982-04-23 | Production Casing Operation Performed |
| 1982-05-31 | Perforation Treatment Performed - Jet Perforation |
| 1982-06-07 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1982-12-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1982-12-15 | Perforation Treatment Performed - Jet Perforation |
| 1988-02-13 | Well Log Performed |
| 1988-02-14 | Perforation Treatment Performed - Jet Perforation |
| 1988-11-17 | Well Log Performed |
| 1988-11-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1988-11-18 | Perforation Treatment Performed - Jet Perforation |
| 1988-11-18 | Plug Back Performed |
| 1992-05-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-05-30 | Plug Back Performed |
| 1992-05-30 | Well Log Performed |
| 1992-05-31 | Perforation Treatment Performed - Jet Perforation |
| 1992-05-31 | Well Log Performed |
| 1992-06-01 | Perforation Treatment Performed - Jet Perforation |
| 1992-08-05 | Well Began Production |
| 1992-08-05 | Well Fluid changed to Gas |
| 1992-08-05 | Well Mode changed to Flowing |
| 1993-03-03 | Perforation Treatment Performed - Jet Perforation |
| 1993-03-07 | Perforation Treatment Performed - Jet Perforation |
| 1993-03-07 | Well Log Performed |
| 1993-03-09 | Perforation Treatment Performed - Cement Squeeze |
| 1993-03-10 | Well Log Performed |
| 1993-03-11 | Perforation Treatment Performed - Jet Perforation |
| 1993-03-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-03-13 | Well Log Performed |
| 1993-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-03-14 | Perforation Treatment Performed - Cement Squeeze |
| 1993-03-14 | Well Log Performed |
| 1993-03-15 | Perforation Treatment Performed - Cement Squeeze |
| 1993-03-15 | Well Log Performed |
| 1993-03-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-03-16 | Perforation Treatment Performed - Cement Squeeze |
| 1993-03-16 | Plug Back Performed |
| 1993-03-16 | Well Fluid changed to Gas |
| 1993-03-16 | Well Mode changed to Abandoned Zone |
| 1994-03-31 | Well Log Performed |
| 1994-04-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-04-01 | Plug Back Performed |
| 1994-04-01 | Well Abandoned |
| 1994-04-01 | Well Fluid changed to Gas |
| 1994-04-01 | Well Mode changed to Abandoned |
| 1994-04-02 | Perforation Treatment Performed - Jet Perforation |
| 1994-04-04 | Well Log Performed |
| 1994-04-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1982-05-31 | Perforation | 1990.80 | 1993.00 | 7 |
| 1992-06-01 | Perforation | 1396.00 | 1397.00 | 13 |
| 1993-03-03 | Perforation | 1465.00 | 1468.00 | 13 |
| 1993-03-07 | Perforation | 1570.50 | 1571.50 | 13 |
| 1993-03-07 | Perforation | 1572.00 | 1574.00 | 13 |
| 1993-03-09 | Cement Squeeze | 1570.50 | 1574.00 | 0 |
| 1993-03-11 | Perforation | 1570.00 | 1571.50 | 14 |
| 1993-03-12 | Acid Treatment | 1570.00 | 1571.50 | 0 |
| 1993-03-14 | Acid Treatment | 1465.00 | 1468.00 | 0 |
| 1993-03-14 | Cement Squeeze | 1465.00 | 1468.00 | 0 |
| 1993-03-15 | Cement Squeeze | 1405.00 | 1407.00 | 0 |
| 1982-06-07 | Acid Wash | 1990.80 | 1993.00 | 0 |
| 1993-03-16 | Acid Treatment | 1396.00 | 1397.00 | 0 |
| 1993-03-16 | Cement Squeeze | 1396.00 | 1397.00 | 0 |
| 1994-04-01 | Packing Device Capped w/Cement | 1555.00 | 1563.00 | 0 |
| 1994-04-02 | Perforation | 1355.00 | 1357.00 | 14 |
| 1994-04-05 | Packing Device Capped w/Cement | 1337.00 | 1345.00 | 0 |
| 1982-12-13 | Packing Device Capped w/Cement | 1972.00 | 1980.00 | 0 |
| 1982-12-15 | Perforation | 1572.00 | 1574.00 | 13 |
| 1988-02-14 | Perforation | 1570.50 | 1571.50 | 13 |
| 1988-11-18 | Packing Device Capped w/Cement | 1552.00 | 1560.00 | 0 |
| 1988-11-18 | Perforation | 1465.00 | 1468.00 | 13 |
| 1992-05-30 | Packing Device Capped w/Cement | 1447.00 | 1455.00 | 0 |
| 1992-05-31 | Perforation | 1405.00 | 1407.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1992 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1982-03-26 | Lost Circulation | 267.00 | 267.00 |
For data sources see[6]