If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0756073202002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.544072,"lon":-119.042889,"icon":""}]} |
Location: 00/02-32-075-07W6/2 | |
Location Alias: 00/02-32-75-07 W6M | |
Location Alias 2: 00/02-32-075-07 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 6 | |
Range: 07 | |
Section: 32 | |
County/Municipality: Saddle Hills County | |
Well Name: TIDEWATER VALHALLA 7-32-75-7 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0220047 | |
License Date: 1998-12-18 | |
License Status: Suspension | |
Spud Date: 1999-09-09 | |
Final Drill Date: 1999-09-24 | |
Well Total Depth: 1504.00 m | |
Surface Hole Latitude: 55.544072 | |
Surface Hole Longitude: -119.042889 |
Date | Event |
---|---|
1998-12-18 | Obtained License |
1999-09-10 | Surface Casing Operation Performed |
1999-09-11 | Direction Drilling Operation Performed - Horizontal |
1999-09-16 | Intermediate Casing Operation Performed |
1999-09-21 | Direction Drilling Operation Performed - Horizontal |
1999-09-24 | Finished Drilling |
1999-09-24 | Well Mode changed to Drilled and Cased |
1999-09-25 | Liner Casing Operation Performed |
1999-09-25 | Perforation Treatment Performed - Slotted Liner or Casing |
1999-09-25 | Rig Released |
1999-09-29 | Well Log Performed |
1999-10-15 | Well Began Production |
1999-10-15 | Well Fluid changed to Crude Oil |
1999-10-15 | Well Mode changed to Pumping |
2015-08-07 | Well Fluid changed to Crude Oil |
2015-08-07 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1999-09-11 | 460.00 | Horizontal |
1999-09-21 | 864.80 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-09-25 | Slotted Liner | 814.00 | 1504.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 1540 | 0.0 | 0.0 | 0.0 |
2000 | 5542 | 0.0 | 0.0 | 0.0 |
2001 | 7898 | 0.0 | 0.0 | 0.0 |
2002 | 8732 | 0.0 | 0.0 | 0.0 |
2003 | 4816 | 0.0 | 0.0 | 0.0 |
2004 | 8608 | 0.0 | 0.0 | 0.0 |
2005 | 8030 | 0.0 | 0.0 | 0.0 |
2006 | 7492 | 0.0 | 0.0 | 0.0 |
2007 | 7045 | 0.0 | 0.0 | 0.0 |
2008 | 8352 | 0.0 | 0.0 | 0.0 |
2009 | 8543 | 0.0 | 0.0 | 0.0 |
2010 | 7967 | 0.0 | 0.0 | 0.0 |
2011 | 2537 | 0.0 | 0.0 | 0.0 |
2012 | 5002 | 0.0 | 0.0 | 0.0 |
2014 | 288 | 0.0 | 0.0 | 0.0 |
For data sources see[6]