If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0756073302000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.556596,"lon":-119.030311,"icon":""}]} |
| Location: 00/02-33-075-07W6/0 | |
| Location Alias: 00/02-33-75-07 W6M | |
| Location Alias 2: 00/02-33-075-07 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 075 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 33 | |
| County/Municipality: Saddle Hills County | |
| Well Name: TOURMALINE HZ VALHALLA 2-33-75-7 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0484296 | |
| License Date: 2017-06-29 | |
| License Status: Issued | |
| Spud Date: 2017-07-06 | |
| Final Drill Date: 2017-08-08 | |
| Well Total Depth: 3825.00 m | |
| Surface Hole Latitude: 55.556596 | |
| Surface Hole Longitude: -119.030311 |
| Date | Event |
|---|---|
| 2017-06-29 | Obtained License |
| 2017-07-07 | Surface Casing Operation Performed |
| 2017-07-31 | Direction Drilling Operation Performed - Deviate |
| 2017-08-02 | Direction Drilling Operation Performed - Horizontal |
| 2017-08-03 | Intermediate Casing Operation Performed |
| 2017-08-03 | Well Log Performed |
| 2017-08-08 | Finished Drilling |
| 2017-08-08 | Well Log Performed |
| 2017-08-08 | Well Mode changed to Drilled and Cased |
| 2017-08-09 | Liner Casing Operation Performed |
| 2017-08-10 | Rig Released |
| 2017-08-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-09-28 | Well Began Production |
| 2017-09-28 | Well Fluid changed to Crude Oil |
| 2017-09-28 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-08-04 | Precision Drilling Corporation | 226 | N/A | Resumption |
| 2017-07-06 | Precision Drilling Corporation | 226 | N/A | Set Surface |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-07-31 | 818.00 | Deviate (5 - 79 degrees) |
| 2017-08-02 | 2007.70 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-08-21 | Multi-Stage Fracture | 3802.60 | 3802.70 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3251.90 | 3252.00 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3194.00 | 3194.10 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3146.80 | 3146.90 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3100.10 | 3100.20 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3041.00 | 3041.10 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2993.10 | 2993.20 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2945.90 | 2946.00 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2887.30 | 2887.40 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2839.80 | 2839.90 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2793.00 | 2793.10 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3755.80 | 3755.90 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2734.00 | 2734.10 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2687.50 | 2687.60 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2639.90 | 2640.00 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2581.50 | 2581.60 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2534.50 | 2534.60 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2487.40 | 2487.50 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2429.40 | 2429.50 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2382.80 | 2382.90 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2336.50 | 2336.60 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2278.10 | 2278.20 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3708.40 | 3708.50 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2231.60 | 2231.70 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2184.80 | 2184.90 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2126.80 | 2126.90 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2079.00 | 2079.10 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3650.20 | 3650.30 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3603.10 | 3603.20 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3450.70 | 3450.80 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3403.20 | 3403.30 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3344.20 | 3344.30 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 3298.00 | 3298.10 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-08-21 | 2017-08-21 | 1,725 | 5,508 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 91.018 | N/A | |||
| Sand (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 0.8315 | N/A | ||
| Sand (20/40) Ottawa | Trican | silica crystalline | 14808-60-7 | 100 | 4.6656 | N/A | ||
| Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 0.7916 | N/A | ||
| SiberProp (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 4.3083 | N/A | ||
| Tolcide PS75LT | Trican | Bactericide/Biocide | tetrakis(hydroxymethyl)phosphonium sulphate | 55566-30-8 | 100 | 0.0126 | N/A | |
| water | Not Available | 100 | 0.0126 | N/A | ||||
| CAN-1912 Clay Stabilizer | Trican | Clay Control | non-hazardous ingredients | Not Available | 100 | 0.0978 | N/A | |
| CAN-2057 Friction Reducer | Trican | Friction Reducer | acrylamide modified polymer | 9972 | 100 | 0.0486 | N/A | |
| distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0486 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0486 | N/A | ||||
| CAN-1402 Scale Inhibitor | Trican | Scale Inhibitor | methanol | 67-56-1 | 100 | 0.036 | N/A | |
| potassium chloride | 7447-40-7 | 100 | 0.036 | N/A | ||||
| water | Not Available | 100 | 0.036 | N/A | ||||
| CAN-2412 Non-emulsifier | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0876 | N/A | |
| benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0876 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0876 | N/A | ||||
| methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0876 | N/A | ||||
| water | Not Available | 100 | 0.0876 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-08-21 | 2017-08-22 | Surface Water - Runoff | 5838 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 2334 | 0.0 | 0.0 | 0.0 |
| 2018 | 7392 | 0.0 | 0.0 | 0.0 |
| 2019 | 6118 | 0.0 | 0.0 | 0.0 |
| 2020 | 1611 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-08-08 | No Incident Encountered | 0.00 | 0.00 |
| 2017-09-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]