X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756080814000

Well Details

Well ID: 0756080814000
Loading map...
Location: 00/14-08-075-08W6/0
Location Alias: 00/14-08-75-08 W6M
Location Alias 2: 00/14-08-075-08 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 08
Section: 08
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER VALHALLA 14-8-75-8
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0101031
License Date: 1983-03-18
License Status: Suspension
Spud Date: 1983-05-16
Final Drill Date: 1983-05-20
Well Total Depth: 713.00 m
Surface Hole Latitude: 55.489656
Surface Hole Longitude: -119.206311

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-03-18 Obtained License
1983-05-17 Water Flow Occurred
1983-05-19 Drill Stem Test Performed
1983-05-20 Finished Drilling
1983-05-21 Drill Stem Test Performed
1983-05-22 Production Casing Operation Performed
1983-05-22 Well Mode changed to Drilled and Cased
1983-06-01 Perforation Treatment Performed - Jet Perforation
1983-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-08 Perforation Treatment Performed - Fractured
1983-07-01 Well Began Production
1983-07-01 Well Fluid changed to Crude Oil
1983-07-01 Well Mode changed to Pumping
1993-01-07 Perforation Treatment Performed - Fractured
1993-01-09 Perforation Treatment Performed - Fractured
1997-11-22 Perforation Treatment Performed - Chemical Squeeze
2014-08-30 Well Fluid changed to Crude Oil
2014-08-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-06-01 Perforation 690.50 695.50 13
1983-06-02 Acid Treatment 690.50 695.50 0
1983-06-08 Fracture 690.50 695.50 0
1993-01-07 Fracture 690.50 695.50 0
1993-01-09 Fracture 690.50 695.50 0
1997-11-22 Chemical Squeeze 690.50 695.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 4278 0.0 0.0 0.0
1984 8596 0.0 0.0 0.0
1985 8164 0.0 0.0 0.0
1986 8618 0.0 0.0 0.0
1987 8516 0.0 0.0 0.0
1988 8005 0.0 0.0 0.0
1989 8333 0.0 0.0 0.0
1990 8295 0.0 0.0 0.0
1991 8540 0.0 0.0 0.0
1992 8516 0.0 0.0 0.0
1993 7796 0.0 0.0 0.0
1994 8626 0.0 0.0 0.0
1995 8695 0.0 0.0 0.0
1996 8665 0.0 0.0 0.0
1997 8392 0.0 0.0 0.0
1998 8511 0.0 0.0 0.0
1999 8650 0.0 0.0 0.0
2000 7991 0.0 0.0 0.0
2001 8687 0.0 0.0 0.0
2002 8740 0.0 0.0 0.0
2003 8750 0.0 0.0 0.0
2004 8687 0.0 0.0 0.0
2005 8119 0.0 0.0 0.0
2006 8183 0.0 0.0 0.0
2007 7296 0.0 0.0 0.0
2008 8647 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8753 0.0 0.0 0.0
2012 6719 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1983-05-17 Water Flow 194.00 0.00

For data sources see[6]

References