X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756081906000

Well Details

Well ID: 0756081906000
Loading map...
Location: 00/06-19-075-08W6/0
Location Alias: 00/06-19-75-08 W6M
Location Alias 2: 00/06-19-075-08 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 08
Section: 19
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER LA GLACE 6-19-75-8
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0096209
License Date: 1982-06-09
License Status: Suspension
Spud Date: 1982-06-18
Final Drill Date: 1982-06-23
Well Total Depth: 754.00 m
Surface Hole Latitude: 55.511692
Surface Hole Longitude: -119.231293

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-06-09 Obtained License
1982-06-23 Finished Drilling
1982-06-23 Well Log Performed
1982-06-24 Production Casing Operation Performed
1982-06-25 Well Mode changed to Drilled and Cased
1982-09-02 Perforation Treatment Performed - Jet Perforation
1982-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-19 Well Began Production
1982-12-19 Well Fluid changed to Crude Oil
1982-12-19 Well Mode changed to Pumping
1989-08-03 Perforation Treatment Performed - Fractured
1998-10-30 Well Fluid changed to Crude Oil
1998-10-30 Well Mode changed to Suspended
1999-05-02 Well Fluid changed to Crude Oil
1999-05-02 Well Mode changed to Pumping
2003-09-01 Well Fluid changed to Crude Oil
2003-09-01 Well Mode changed to Suspended
2003-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-30 Plug Back Performed
2003-10-30 Well Fluid changed to Crude Oil
2003-10-30 Well Log Performed
2003-10-30 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-09-02 Perforation 710.00 712.50 13
1982-09-04 Acid Treatment 710.00 712.50 0
1989-08-03 Fracture 710.00 712.50 0
2003-10-30 Packing Device Capped w/Cement 689.00 697.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 283 0.0 0.0 0.0
1983 6425 0.0 0.0 0.0
1984 8675 0.0 0.0 0.0
1985 8434 0.0 0.0 0.0
1986 8138 0.0 0.0 0.0
1987 8126 0.0 0.0 0.0
1988 8335 0.0 0.0 0.0
1989 8266 0.0 0.0 0.0
1990 7113 0.0 0.0 0.0
1991 7901 0.0 0.0 0.0
1992 8401 0.0 0.0 0.0
1993 8499 0.0 0.0 0.0
1994 8693 0.0 0.0 0.0
1995 8244 0.0 0.0 0.0
1996 8734 0.0 0.0 0.0
1997 6650 0.0 0.0 0.0
1999 720 0.0 0.0 0.0

For data sources see[5]

References