If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0756082108020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.503987,"lon":-119.16822,"icon":""}]} |
Location: 02/08-21-075-08W6/0 | |
Location Alias: 02/08-21-75-08 W6M | |
Location Alias 2: 02/08-21-075-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 6 | |
Range: 08 | |
Section: 21 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: TIDEWATER LA GLACE 8-21-75-8 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0307722 | |
License Date: 2004-04-28 | |
License Status: Amended | |
Spud Date: 2004-07-14 | |
Final Drill Date: 2004-07-21 | |
Well Total Depth: 1488.00 m | |
Surface Hole Latitude: 55.503987 | |
Surface Hole Longitude: -119.168220 |
Date | Event |
---|---|
2004-04-28 | Obtained License |
2004-07-15 | Surface Casing Operation Performed |
2004-07-17 | Direction Drilling Operation Performed - Horizontal |
2004-07-19 | Intermediate Casing Operation Performed |
2004-07-21 | Finished Drilling |
2004-07-21 | Well Mode changed to Drilled and Cased |
2004-07-22 | Well Log Performed |
2004-07-23 | Liner Casing Operation Performed |
2004-07-23 | Perforation Treatment Performed - Slotted Liner or Casing |
2004-07-24 | Rig Released |
2004-12-01 | Well Began Injection |
2004-12-01 | Well Fluid changed to Water |
2004-12-01 | Well Type changed to Injection |
2007-02-15 | Perforation Treatment Performed - Chemical Squeeze |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2004-07-17 | 497.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-07-23 | Slotted Liner | 827.00 | 1427.80 | 0 |
2007-02-15 | Chemical Squeeze | 827.00 | 1427.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]