If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0756082707020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.532693,"lon":-119.183825,"icon":""}]} |
| Location: 02/07-27-075-08W6/0 | |
| Location Alias: 02/07-27-75-08 W6M | |
| Location Alias 2: 02/07-27-075-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 075 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 27 | |
| County/Municipality: County of Grande Prairie No. 1 | |
| Well Name: SLE LA GLACE 7-27-75-8 | |
| Operator Name: SanLing Energy Ltd. | |
| License Number: 0441561 | |
| License Date: 2011-12-16 | |
| License Status: Amended | |
| Spud Date: 2012-01-28 | |
| Final Drill Date: 2012-03-15 | |
| Well Total Depth: 5943.00 m | |
| Surface Hole Latitude: 55.532693 | |
| Surface Hole Longitude: -119.183825 |
| Date | Event |
|---|---|
| 2011-12-16 | Obtained License |
| 2012-01-30 | Surface Casing Operation Performed |
| 2012-02-11 | Well Log Performed |
| 2012-02-15 | Direction Drilling Operation Performed - Deviate |
| 2012-02-18 | Intermediate Casing Operation Performed |
| 2012-02-18 | Well Log Performed |
| 2012-02-21 | Direction Drilling Operation Performed - Horizontal |
| 2012-03-15 | Finished Drilling |
| 2012-03-15 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-03-15 | Well Mode changed to Drilled and Cased |
| 2012-03-17 | Well Log Performed |
| 2012-03-20 | Liner Casing Operation Performed |
| 2012-03-22 | Rig Released |
| 2012-05-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-05-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-05-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-05-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-05-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-05-22 | Well Fluid changed to Gas |
| 2012-05-22 | Well Mode changed to Testing |
| 2012-06-07 | Well Began Production |
| 2012-06-07 | Well Fluid changed to Gas |
| 2012-06-07 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-01-28 | Ensign Drilling Inc. | 120 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-15 | 3374.30 | Deviate (5 - 79 degrees) |
| 2012-02-21 | 3706.30 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-03-15 | Open Hole/Barefoot Completion | 5933.00 | 5943.00 | 0 |
| 2012-05-20 | Multi-Stage Fracture | 4175.30 | 4176.50 | 0 |
| 2012-05-20 | Multi-Stage Fracture | 4328.60 | 4329.80 | 0 |
| 2012-05-20 | Multi-Stage Fracture | 4492.30 | 4493.50 | 0 |
| 2012-05-20 | Multi-Stage Fracture | 4628.90 | 4630.10 | 0 |
| 2012-05-21 | Multi-Stage Fracture | 3704.90 | 3706.10 | 0 |
| 2012-05-21 | Multi-Stage Fracture | 3844.10 | 3845.30 | 0 |
| 2012-05-21 | Multi-Stage Fracture | 4023.80 | 4025.00 | 0 |
| 2012-05-17 | Multi-Stage Fracture | 5905.00 | 5908.10 | 0 |
| 2012-05-17 | Multi-Stage Fracture | 5727.00 | 5728.20 | 0 |
| 2012-05-18 | Multi-Stage Fracture | 5414.30 | 5415.50 | 0 |
| 2012-05-18 | Multi-Stage Fracture | 5575.80 | 5577.00 | 0 |
| 2012-05-19 | Multi-Stage Fracture | 4809.50 | 4818.70 | 0 |
| 2012-05-19 | Multi-Stage Fracture | 4922.50 | 4923.70 | 0 |
| 2012-05-19 | Multi-Stage Fracture | 5088.80 | 5090.00 | 0 |
| 2012-05-19 | Multi-Stage Fracture | 5265.80 | 5267.00 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 4690 | 0.0 | 0.0 | 0.0 |
| 2013 | 8629 | 0.0 | 0.0 | 0.0 |
| 2014 | 8025 | 0.0 | 0.0 | 0.0 |
| 2015 | 8507 | 0.0 | 0.0 | 0.0 |
| 2016 | 8194 | 0.0 | 0.0 | 0.0 |
| 2017 | 5787 | 0.0 | 0.0 | 0.0 |
| 2018 | 7261 | 0.0 | 0.0 | 0.0 |
| 2019 | 8420 | 0.0 | 0.0 | 0.0 |
| 2020 | 2120 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-03-22 | No Incident Encountered | 0.00 | 0.00 |
| 2012-06-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]