X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756082812000

Well Details

Well ID: 0756082812000
Loading map...
Location: 00/12-28-075-08W6/0
Location Alias: 00/12-28-75-08 W6M
Location Alias 2: 00/12-28-075-08 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 08
Section: 28
County/Municipality: County of Grande Prairie No. 1
Well Name: TIDEWATER LA GLACE 12-28-75-8
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0163300
License Date: 1993-12-16
License Status: Suspension
Spud Date: 1994-01-30
Final Drill Date: 1994-02-02
Well Total Depth: 873.00 m
Surface Hole Latitude: 55.526325
Surface Hole Longitude: -119.180284

For data sources see[1][2]

Well History

Date Event
1993-12-16 Obtained License
1994-01-30 Direction Drilling Operation Performed - Deviate
1994-01-31 Surface Casing Operation Performed
1994-02-02 Finished Drilling
1994-02-02 Well Log Performed
1994-02-02 Well Mode changed to Drilled and Cased
1994-02-03 Production Casing Operation Performed
1994-02-03 Rig Released
1994-02-10 Well Log Performed
1994-02-12 Perforation Treatment Performed - Jet Perforation
1994-02-12 Well Log Performed
1994-02-13 Perforation Treatment Performed - Fractured
1994-04-23 Well Began Injection
1994-04-23 Well Fluid changed to Water
1994-04-23 Well Type changed to Injection
1999-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-08-13 Well Fluid changed to Water
2009-08-13 Well Mode changed to Suspended
2009-08-13 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-01-30 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-12 Perforation 849.00 850.00 13
1994-02-13 Fracture 849.00 850.00 0
1999-06-30 Acid Treatment 849.00 850.00 0
1999-10-04 Acid Treatment 849.00 850.00 0
2000-02-05 Acid Treatment 849.00 850.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0

For data sources see[6]

References