If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0765072604034 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.619228,"lon":-114.980591,"icon":""}]} |
Location: 03/04-26-076-07W5/4 | |
Location Alias: 03/04-26-76-07 W5M | |
Location Alias 2: 03/04-26-076-07 W5/04 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 5 | |
Range: 07 | |
Section: 26 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: PRED HIGHWOOD NIPISI 4-26-76-7 | |
Operator Name: Highwood Oil Company Ltd. | |
License Number: 0493874 | |
License Date: 2019-02-26 | |
License Status: Amended | |
Spud Date: 2019-03-12 | |
Final Drill Date: 2019-03-24 | |
Well Total Depth: 1911.00 m | |
Surface Hole Latitude: 55.619228 | |
Surface Hole Longitude: -114.980591 |
Date | Event |
---|---|
2019-02-26 | Obtained License |
2019-03-13 | Surface Casing Operation Performed |
2019-03-14 | Direction Drilling Operation Performed - Deviate |
2019-03-14 | Direction Drilling Operation Performed - Horizontal |
2019-03-15 | Intermediate Casing Operation Performed |
2019-03-18 | Direction Drilling Operation Performed - Horizontal |
2019-03-19 | Well Log Performed |
2019-03-24 | Finished Drilling |
2019-03-24 | Rig Released |
2019-03-24 | Well Structure changed to Drain |
2019-03-29 | Perforation Treatment Performed - Open-Hole Completion |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2019-03-14 | 472.50 | Deviate (5 - 79 degrees) |
2019-03-14 | 766.70 | Horizontal |
2019-03-18 | 938.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-03-29 | Open Hole/Barefoot Completion | 842.40 | 1911.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-03-24 | No Incident Encountered | 0.00 | 0.00 |
2019-04-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]