If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0765223516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.632738,"lon":-117.292791,"icon":""}]} |
Location: 00/16-35-076-22W5/0 | |
Location Alias: 00/16-35-76-22 W5M | |
Location Alias 2: 00/16-35-076-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 5 | |
Range: 22 | |
Section: 35 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: N7 ENERGY GVILLEE 16-35-76-22 | |
Operator Name: N7 Energy Ltd. | |
License Number: 0115006 | |
License Date: 1985-05-31 | |
License Status: Suspension | |
Spud Date: 1985-07-11 | |
Final Drill Date: 1985-08-03 | |
Well Total Depth: 2474.00 m | |
Surface Hole Latitude: 55.632738 | |
Surface Hole Longitude: -117.292791 |
Date | Event |
---|---|
1985-05-31 | Obtained License |
1985-07-13 | Surface Casing Operation Performed |
1985-07-17 | Drill Stem Test Performed |
1985-08-03 | Finished Drilling |
1985-08-03 | Well Log Performed |
1985-08-03 | Well Mode changed to Drilled and Cased |
1985-08-04 | Well Log Performed |
1985-08-06 | Drill Stem Test Performed |
1985-08-07 | Drill Stem Test Performed |
1985-08-08 | Well Log Performed |
1985-08-09 | Drill Stem Test Performed |
1985-08-10 | Drill Stem Test Performed |
1985-08-12 | Production Casing Operation Performed |
1985-08-13 | Rig Released |
1985-11-04 | Perforation Treatment Performed - Jet Perforation |
1985-11-13 | Well Began Production |
1985-11-13 | Well Fluid changed to Crude Oil |
1985-11-13 | Well Mode changed to Flowing |
1994-06-11 | Well Fluid changed to Crude Oil |
1994-06-11 | Well Mode changed to Pumping |
2003-06-18 | Well Log Performed |
2003-06-21 | Perforation Treatment Performed - Jet Perforation |
2003-06-21 | Well Log Performed |
2003-06-24 | Perforation Treatment Performed - Cement Squeeze |
2003-06-24 | Plug Back Performed |
2003-06-25 | Well Log Performed |
2007-10-16 | Well Log Performed |
2007-10-19 | Perforation Treatment Performed - Jet Perforation |
2007-10-19 | Well Log Performed |
2007-10-29 | Perforation Treatment Performed - Fractured |
2007-11-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-11-08 | Plug Back Performed |
2008-07-03 | Perforation Treatment Performed - Jet Perforation |
2008-07-03 | Well Log Performed |
2008-07-04 | Perforation Treatment Performed - Remedial Casing |
2008-07-05 | Perforation Treatment Performed - Jet Perforation |
2008-07-05 | Perforation Treatment Performed - Remedial Casing |
2008-07-05 | Well Log Performed |
2008-07-06 | Perforation Treatment Performed - Jet Perforation |
2008-07-06 | Well Log Performed |
2008-07-08 | Perforation Treatment Performed - Fractured |
2010-09-02 | Well Fluid changed to Crude Oil |
2010-09-02 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-11-04 | Perforation | 2444.00 | 2446.00 | 13 |
2008-07-05 | Remedial Casing Cementing | 2413.50 | 2414.50 | 0 |
2008-07-06 | Perforation | 2400.50 | 2404.00 | 20 |
2008-07-08 | Fracture | 2400.50 | 2404.00 | 0 |
2003-06-21 | Perforation | 2401.00 | 2403.00 | 20 |
2003-06-24 | Cement Squeeze | 2401.00 | 2403.00 | 0 |
2007-10-19 | Perforation | 2400.50 | 2404.00 | 20 |
2007-10-29 | Fracture | 2400.50 | 2404.00 | 0 |
2007-11-08 | Packing Device Capped w/Cement | 2419.00 | 2429.00 | 0 |
2008-07-03 | Perforation | 2418.00 | 2419.00 | 20 |
2008-07-04 | Remedial Casing Cementing | 2418.00 | 2419.00 | 0 |
2008-07-05 | Perforation | 2413.50 | 2414.50 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 1008 | 0.0 | 0.0 | 0.0 |
1986 | 6136 | 0.0 | 0.0 | 0.0 |
1987 | 7462 | 0.0 | 0.0 | 0.0 |
1988 | 8744 | 0.0 | 0.0 | 0.0 |
1989 | 8684 | 0.0 | 0.0 | 0.0 |
1990 | 6451 | 0.0 | 0.0 | 0.0 |
1991 | 7734 | 0.0 | 0.0 | 0.0 |
1992 | 7991 | 0.0 | 0.0 | 0.0 |
1993 | 4205 | 0.0 | 0.0 | 0.0 |
1994 | 8213 | 0.0 | 0.0 | 0.0 |
1995 | 8512 | 0.0 | 0.0 | 0.0 |
1996 | 8214 | 0.0 | 0.0 | 0.0 |
1997 | 8587 | 0.0 | 0.0 | 0.0 |
1998 | 8101 | 0.0 | 0.0 | 0.0 |
1999 | 8370 | 0.0 | 0.0 | 0.0 |
2000 | 8618 | 0.0 | 0.0 | 0.0 |
2001 | 7660 | 0.0 | 0.0 | 0.0 |
2002 | 6218 | 0.0 | 0.0 | 0.0 |
2003 | 7428 | 0.0 | 0.0 | 0.0 |
2004 | 6714 | 0.0 | 0.0 | 0.0 |
2005 | 4223 | 0.0 | 0.0 | 0.0 |
2006 | 2298 | 0.0 | 0.0 | 0.0 |
2007 | 5185 | 0.0 | 0.0 | 0.0 |
For data sources see[5]