If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0765223516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.632738,"lon":-117.292791,"icon":""}]} |
| Location: 00/16-35-076-22W5/0 | |
| Location Alias: 00/16-35-76-22 W5M | |
| Location Alias 2: 00/16-35-076-22 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 076 | |
| Meridian: 5 | |
| Range: 22 | |
| Section: 35 | |
| County/Municipality: Municipal District of Smoky River No. 130 | |
| Well Name: N7 ENERGY GVILLEE 16-35-76-22 | |
| Operator Name: N7 Energy Ltd. | |
| License Number: 0115006 | |
| License Date: 1985-05-31 | |
| License Status: Suspension | |
| Spud Date: 1985-07-11 | |
| Final Drill Date: 1985-08-03 | |
| Well Total Depth: 2474.00 m | |
| Surface Hole Latitude: 55.632738 | |
| Surface Hole Longitude: -117.292791 |
| Date | Event |
|---|---|
| 1985-05-31 | Obtained License |
| 1985-07-13 | Surface Casing Operation Performed |
| 1985-07-17 | Drill Stem Test Performed |
| 1985-08-03 | Finished Drilling |
| 1985-08-03 | Well Log Performed |
| 1985-08-03 | Well Mode changed to Drilled and Cased |
| 1985-08-04 | Well Log Performed |
| 1985-08-06 | Drill Stem Test Performed |
| 1985-08-07 | Drill Stem Test Performed |
| 1985-08-08 | Well Log Performed |
| 1985-08-09 | Drill Stem Test Performed |
| 1985-08-10 | Drill Stem Test Performed |
| 1985-08-12 | Production Casing Operation Performed |
| 1985-08-13 | Rig Released |
| 1985-11-04 | Perforation Treatment Performed - Jet Perforation |
| 1985-11-13 | Well Began Production |
| 1985-11-13 | Well Fluid changed to Crude Oil |
| 1985-11-13 | Well Mode changed to Flowing |
| 1994-06-11 | Well Fluid changed to Crude Oil |
| 1994-06-11 | Well Mode changed to Pumping |
| 2003-06-18 | Well Log Performed |
| 2003-06-21 | Perforation Treatment Performed - Jet Perforation |
| 2003-06-21 | Well Log Performed |
| 2003-06-24 | Perforation Treatment Performed - Cement Squeeze |
| 2003-06-24 | Plug Back Performed |
| 2003-06-25 | Well Log Performed |
| 2007-10-16 | Well Log Performed |
| 2007-10-19 | Perforation Treatment Performed - Jet Perforation |
| 2007-10-19 | Well Log Performed |
| 2007-10-29 | Perforation Treatment Performed - Fractured |
| 2007-11-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-11-08 | Plug Back Performed |
| 2008-07-03 | Perforation Treatment Performed - Jet Perforation |
| 2008-07-03 | Well Log Performed |
| 2008-07-04 | Perforation Treatment Performed - Remedial Casing |
| 2008-07-05 | Perforation Treatment Performed - Jet Perforation |
| 2008-07-05 | Perforation Treatment Performed - Remedial Casing |
| 2008-07-05 | Well Log Performed |
| 2008-07-06 | Perforation Treatment Performed - Jet Perforation |
| 2008-07-06 | Well Log Performed |
| 2008-07-08 | Perforation Treatment Performed - Fractured |
| 2010-09-02 | Well Fluid changed to Crude Oil |
| 2010-09-02 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1985-11-04 | Perforation | 2444.00 | 2446.00 | 13 |
| 2008-07-05 | Remedial Casing Cementing | 2413.50 | 2414.50 | 0 |
| 2008-07-06 | Perforation | 2400.50 | 2404.00 | 20 |
| 2008-07-08 | Fracture | 2400.50 | 2404.00 | 0 |
| 2003-06-21 | Perforation | 2401.00 | 2403.00 | 20 |
| 2003-06-24 | Cement Squeeze | 2401.00 | 2403.00 | 0 |
| 2007-10-19 | Perforation | 2400.50 | 2404.00 | 20 |
| 2007-10-29 | Fracture | 2400.50 | 2404.00 | 0 |
| 2007-11-08 | Packing Device Capped w/Cement | 2419.00 | 2429.00 | 0 |
| 2008-07-03 | Perforation | 2418.00 | 2419.00 | 20 |
| 2008-07-04 | Remedial Casing Cementing | 2418.00 | 2419.00 | 0 |
| 2008-07-05 | Perforation | 2413.50 | 2414.50 | 20 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1985 | 1008 | 0.0 | 0.0 | 0.0 |
| 1986 | 6136 | 0.0 | 0.0 | 0.0 |
| 1987 | 7462 | 0.0 | 0.0 | 0.0 |
| 1988 | 8744 | 0.0 | 0.0 | 0.0 |
| 1989 | 8684 | 0.0 | 0.0 | 0.0 |
| 1990 | 6451 | 0.0 | 0.0 | 0.0 |
| 1991 | 7734 | 0.0 | 0.0 | 0.0 |
| 1992 | 7991 | 0.0 | 0.0 | 0.0 |
| 1993 | 4205 | 0.0 | 0.0 | 0.0 |
| 1994 | 8213 | 0.0 | 0.0 | 0.0 |
| 1995 | 8512 | 0.0 | 0.0 | 0.0 |
| 1996 | 8214 | 0.0 | 0.0 | 0.0 |
| 1997 | 8587 | 0.0 | 0.0 | 0.0 |
| 1998 | 8101 | 0.0 | 0.0 | 0.0 |
| 1999 | 8370 | 0.0 | 0.0 | 0.0 |
| 2000 | 8618 | 0.0 | 0.0 | 0.0 |
| 2001 | 7660 | 0.0 | 0.0 | 0.0 |
| 2002 | 6218 | 0.0 | 0.0 | 0.0 |
| 2003 | 7428 | 0.0 | 0.0 | 0.0 |
| 2004 | 6714 | 0.0 | 0.0 | 0.0 |
| 2005 | 4223 | 0.0 | 0.0 | 0.0 |
| 2006 | 2298 | 0.0 | 0.0 | 0.0 |
| 2007 | 5185 | 0.0 | 0.0 | 0.0 |
For data sources see[5]