If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0765231402000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.580533,"lon":-117.454341,"icon":""}]} |
Location: 00/02-14-076-23W5/0 | |
Location Alias: 00/02-14-76-23 W5M | |
Location Alias 2: 00/02-14-076-23 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 5 | |
Range: 23 | |
Section: 14 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: LONG RUN GVILLEE 2-14-76-23 | |
Operator Name: Petro-Lin Energy Corporation | |
License Number: 0397783 | |
License Date: 2008-06-20 | |
License Status: Amended | |
Spud Date: 2008-07-01 | |
Final Drill Date: 2008-07-10 | |
Well Total Depth: 2579.00 m | |
Surface Hole Latitude: 55.580533 | |
Surface Hole Longitude: -117.454341 |
Date | Event |
---|---|
2008-06-20 | Obtained License |
2008-07-03 | Surface Casing Operation Performed |
2008-07-10 | Finished Drilling |
2008-07-10 | Well Mode changed to Drilled and Cased |
2008-07-12 | Well Log Performed |
2008-07-13 | Production Casing Operation Performed |
2008-07-14 | Rig Released |
2008-07-19 | Well Log Performed |
2008-07-20 | Perforation Treatment Performed - Jet Perforation |
2008-07-20 | Well Log Performed |
2008-07-26 | Well Began Production |
2008-07-26 | Well Fluid changed to Crude Oil |
2008-07-26 | Well Mode changed to Pumping |
2008-12-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-12-03 | Plug Back Performed |
2008-12-03 | Well Fluid changed to Crude Oil |
2008-12-03 | Well Mode changed to Abandoned Zone |
2008-12-04 | Perforation Treatment Performed - Jet Perforation |
2008-12-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-12-09 | Plug Back Performed |
2018-01-05 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-07-20 | Perforation | 2539.00 | 2543.50 | 17 |
2008-12-03 | Packing Device Capped w/Cement | 2527.00 | 2535.00 | 0 |
2008-12-04 | Perforation | 2501.00 | 2505.00 | 20 |
2008-12-09 | Packing Device Capped w/Cement | 2489.00 | 2497.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 2536 | 0.0 | 0.0 | 0.0 |
For data sources see[5]