If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0766082608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.591619,"lon":-119.117115,"icon":""}]} |
| Location: 00/08-26-076-08W6/0 | |
| Location Alias: 00/08-26-76-08 W6M | |
| Location Alias 2: 00/08-26-076-08 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 076 | |
| Meridian: 6 | |
| Range: 08 | |
| Section: 26 | |
| County/Municipality: Saddle Hills County | |
| Well Name: TOURMALINE HZ VALHALLA 8-26-76-8 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0490894 | |
| License Date: 2018-09-11 | |
| License Status: Issued | |
| Spud Date: 2018-10-23 | |
| Final Drill Date: 2018-11-04 | |
| Well Total Depth: 4115.00 m | |
| Surface Hole Latitude: 55.591619 | |
| Surface Hole Longitude: -119.117115 |
| Date | Event |
|---|---|
| 2018-09-11 | Obtained License |
| 2018-10-24 | Surface Casing Operation Performed |
| 2018-10-26 | Direction Drilling Operation Performed - Deviate |
| 2018-10-30 | Intermediate Casing Operation Performed |
| 2018-10-31 | Direction Drilling Operation Performed - Horizontal |
| 2018-11-04 | Finished Drilling |
| 2018-11-04 | Well Log Performed |
| 2018-11-04 | Well Mode changed to Drilled and Cased |
| 2018-11-05 | Liner Casing Operation Performed |
| 2018-11-06 | Rig Released |
| 2018-12-05 | Well Log Performed |
| 2018-12-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-02-21 | Well Began Production |
| 2019-02-21 | Well Fluid changed to Crude Oil |
| 2019-02-21 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2018-10-23 | Precision Drilling Corporation | 226 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2018-10-26 | 1630.40 | Deviate (5 - 79 degrees) |
| 2018-10-31 | 2143.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2018-12-10 | Multi-Stage Fracture | 4089.60 | 4089.70 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3676.10 | 3676.20 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3631.70 | 3631.80 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3572.90 | 3573.00 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3528.90 | 3529.00 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3469.60 | 3469.70 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3424.80 | 3424.90 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3365.60 | 3365.70 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3321.00 | 3321.10 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3262.70 | 3262.80 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3217.80 | 3217.90 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 4060.80 | 4060.90 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3159.00 | 3159.10 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3114.20 | 3114.30 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3055.10 | 3055.20 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3010.50 | 3010.60 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2951.70 | 2951.80 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2907.00 | 2907.10 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2848.30 | 2848.40 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2803.70 | 2803.80 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2745.10 | 2745.20 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2700.40 | 2700.50 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 4016.10 | 4016.20 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2641.40 | 2641.50 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2597.80 | 2597.90 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2539.20 | 2539.30 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2496.10 | 2496.20 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2437.50 | 2437.60 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2393.60 | 2393.70 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2335.40 | 2335.50 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2290.50 | 2290.60 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2231.60 | 2231.70 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2187.30 | 2187.40 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3971.30 | 3971.40 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 2128.50 | 2128.60 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3926.50 | 3926.60 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3883.60 | 3883.70 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3838.80 | 3838.90 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3779.70 | 3779.80 | 0 |
| 2018-12-10 | Multi-Stage Fracture | 3735.10 | 3735.20 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2018-12-10 | 2018-12-10 | 1,941 | 10,643 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 83.845 | N/A | |||
| Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 15.9458 | N/A | ||
| WBO-2 | Trican | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0123 | N/A | |
| FR-23 | Trican | Friction Reducer | acrylamide modified polymer | 9972 | 100 | 0.0722 | N/A | |
| distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0722 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0722 | N/A | ||||
| SI-18 | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0403 | N/A | |
| PFC-3 | Trican | Surfactant | aminofunctional polymer | 10352 | 100 | 0.0524 | N/A | |
| glycol ether | 10352 | 100 | 0.0524 | N/A | ||||
| petroleum distillates | 10352 | 100 | 0.0524 | N/A | ||||
| silicon compound | 10352 | 100 | 0.0524 | N/A | ||||
| S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0316 | N/A | |
| benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0316 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0316 | N/A | ||||
| methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0316 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0316 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2018-12-10 | 2018-12-11 | Surface Water - Runoff | 10642 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 5485 | 0.0 | 0.0 | 0.0 |
| 2020 | 2015 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-11-04 | No Incident Encountered | 0.00 | 0.00 |
| 2018-12-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]