If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766100805020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.570407,"lon":-119.495946,"icon":""}]} |
Location: 02/05-08-076-10W6/0 | |
Location Alias: 02/05-08-76-10 W6M | |
Location Alias 2: 02/05-08-076-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 10 | |
Section: 08 | |
County/Municipality: Saddle Hills County | |
Well Name: INSIGNIAENERGY VALHALLA 5-8-76-10 | |
Operator Name: Insignia Energy Ltd. | |
License Number: 0421420 | |
License Date: 2010-06-25 | |
License Status: Issued | |
Spud Date: 2010-07-08 | |
Final Drill Date: 2010-08-05 | |
Well Total Depth: 4182.00 m | |
Surface Hole Latitude: 55.570407 | |
Surface Hole Longitude: -119.495946 |
Date | Event |
---|---|
2010-06-25 | Obtained License |
2010-07-10 | Surface Casing Operation Performed |
2010-07-18 | Direction Drilling Operation Performed - Horizontal |
2010-07-26 | Well Log Performed |
2010-07-27 | Intermediate Casing Operation Performed |
2010-08-05 | Finished Drilling |
2010-08-05 | Well Mode changed to Drilled and Cased |
2010-08-08 | Liner Casing Operation Performed |
2010-08-08 | Perforation Treatment Performed - Open-Hole Completion |
2010-08-10 | Rig Released |
2010-09-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-09-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-09-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-16 | Well Began Production |
2011-03-16 | Well Fluid changed to Gas |
2011-03-16 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-07-18 | 2105.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-08-08 | Open Hole/Barefoot Completion | 4174.20 | 4182.00 | 0 |
2010-09-11 | Multi-Stage Fracture | 3519.80 | 3520.60 | 0 |
2010-09-12 | Multi-Stage Fracture | 3448.20 | 3449.00 | 0 |
2010-09-12 | Multi-Stage Fracture | 3363.90 | 3364.70 | 0 |
2010-09-13 | Multi-Stage Fracture | 3292.40 | 3293.20 | 0 |
2010-09-13 | Multi-Stage Fracture | 3220.90 | 3221.70 | 0 |
2010-09-13 | Multi-Stage Fracture | 3136.00 | 3136.80 | 0 |
2010-09-13 | Multi-Stage Fracture | 3064.50 | 3065.30 | 0 |
2010-09-13 | Multi-Stage Fracture | 2908.10 | 2908.90 | 0 |
2010-09-13 | Multi-Stage Fracture | 2823.30 | 2824.10 | 0 |
2010-09-13 | Multi-Stage Fracture | 2751.80 | 2752.60 | 0 |
2010-09-11 | Multi-Stage Fracture | 4138.30 | 4139.10 | 0 |
2010-09-13 | Multi-Stage Fracture | 2680.10 | 2680.90 | 0 |
2010-09-13 | Multi-Stage Fracture | 2595.20 | 2596.00 | 0 |
2010-09-13 | Multi-Stage Fracture | 2544.00 | 2544.80 | 0 |
2010-09-11 | Multi-Stage Fracture | 4060.00 | 4060.80 | 0 |
2010-09-11 | Multi-Stage Fracture | 3988.50 | 3989.30 | 0 |
2010-09-11 | Multi-Stage Fracture | 3917.20 | 3918.00 | 0 |
2010-09-11 | Multi-Stage Fracture | 3832.40 | 3833.20 | 0 |
2010-09-11 | Multi-Stage Fracture | 3760.90 | 3761.70 | 0 |
2010-09-11 | Multi-Stage Fracture | 3679.10 | 3679.90 | 0 |
2010-09-11 | Multi-Stage Fracture | 3604.60 | 3605.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2863 | 0.0 | 0.0 | 0.0 |
2012 | 3296 | 0.0 | 0.0 | 0.0 |
2013 | 6671 | 0.0 | 0.0 | 0.0 |
2014 | 7054 | 0.0 | 0.0 | 0.0 |
2015 | 8619 | 0.0 | 0.0 | 0.0 |
2016 | 6935 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[6]