If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0766123105000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.636747,"lon":-119.886691,"icon":""}]} |
| Location: 00/05-31-076-12W6/0 | |
| Location Alias: 00/05-31-76-12 W6M | |
| Location Alias 2: 00/05-31-076-12 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 076 | |
| Meridian: 6 | |
| Range: 12 | |
| Section: 31 | |
| County/Municipality: Saddle Hills County | |
| Well Name: AVN HZ GLACIER 5-31-76-12 | |
| Operator Name: Advantage Oil & Gas Ltd. | |
| License Number: 0435322 | |
| License Date: 2011-07-20 | |
| License Status: Issued | |
| Spud Date: 2011-08-20 | |
| Final Drill Date: 2011-09-11 | |
| Well Total Depth: 4150.00 m | |
| Surface Hole Latitude: 55.636747 | |
| Surface Hole Longitude: -119.886691 |
| Date | Event |
|---|---|
| 2011-07-20 | Obtained License |
| 2011-08-23 | Surface Casing Operation Performed |
| 2011-08-27 | Direction Drilling Operation Performed - Horizontal |
| 2011-09-11 | Finished Drilling |
| 2011-09-11 | Production Casing Operation Performed |
| 2011-09-11 | Well Log Performed |
| 2011-09-11 | Well Mode changed to Drilled and Cased |
| 2011-09-13 | Rig Released |
| 2011-09-17 | Well Log Performed |
| 2011-09-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-09-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-09-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-09-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-09-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-09-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-09-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-09-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-09-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-09-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-09-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-09-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-12-02 | Well Began Production |
| 2011-12-02 | Well Fluid changed to Gas |
| 2011-12-02 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-08-27 | 2017.80 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-09-18 | Multi-Stage Fracture | 4135.00 | 4136.00 | 0 |
| 2011-09-22 | Multi-Stage Fracture | 3650.00 | 3651.00 | 0 |
| 2011-09-22 | Acid Treatment | 3650.00 | 3651.00 | 0 |
| 2011-09-22 | Multi-Stage Fracture | 3529.00 | 3530.00 | 0 |
| 2011-09-22 | Acid Treatment | 3529.00 | 3530.00 | 0 |
| 2011-09-23 | Multi-Stage Fracture | 3408.00 | 3409.00 | 0 |
| 2011-09-23 | Acid Treatment | 3408.00 | 3409.00 | 0 |
| 2011-09-23 | Multi-Stage Fracture | 3287.00 | 3288.00 | 0 |
| 2011-09-23 | Acid Treatment | 3287.00 | 3288.00 | 0 |
| 2011-09-23 | Multi-Stage Fracture | 3166.00 | 3167.00 | 0 |
| 2011-09-24 | Acid Treatment | 3166.00 | 3167.00 | 0 |
| 2011-09-19 | Acid Treatment | 4135.00 | 4136.00 | 0 |
| 2011-09-24 | Multi-Stage Fracture | 3045.00 | 3046.00 | 0 |
| 2011-09-24 | Multi-Stage Fracture | 3039.00 | 3040.00 | 0 |
| 2011-09-24 | Acid Treatment | 3039.00 | 3046.00 | 0 |
| 2011-09-25 | Multi-Stage Fracture | 2924.00 | 2925.00 | 0 |
| 2011-09-25 | Acid Treatment | 2924.00 | 2925.00 | 0 |
| 2011-09-25 | Multi-Stage Fracture | 2803.00 | 2804.00 | 0 |
| 2011-09-25 | Acid Treatment | 2803.00 | 2804.00 | 0 |
| 2011-09-25 | Multi-Stage Fracture | 2682.00 | 2683.00 | 0 |
| 2011-09-25 | Acid Treatment | 2682.00 | 2683.00 | 0 |
| 2011-09-19 | Multi-Stage Fracture | 4013.00 | 4014.00 | 0 |
| 2011-09-19 | Acid Treatment | 4013.00 | 4014.00 | 0 |
| 2011-09-21 | Multi-Stage Fracture | 3892.00 | 3893.00 | 0 |
| 2011-09-21 | Acid Treatment | 3892.00 | 3893.00 | 0 |
| 2011-09-21 | Multi-Stage Fracture | 3771.00 | 3772.00 | 0 |
| 2011-09-21 | Multi-Stage Fracture | 3761.00 | 3762.00 | 0 |
| 2011-09-21 | Acid Treatment | 3761.00 | 3772.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 711 | 0.0 | 0.0 | 0.0 |
| 2012 | 8183 | 0.0 | 0.0 | 0.0 |
| 2013 | 6730 | 0.0 | 0.0 | 0.0 |
| 2014 | 4227 | 0.0 | 0.0 | 0.0 |
| 2015 | 2301 | 0.0 | 0.0 | 0.0 |
| 2016 | 5246 | 0.0 | 0.0 | 0.0 |
| 2017 | 3944 | 0.0 | 0.0 | 0.0 |
| 2018 | 2136 | 0.0 | 0.0 | 0.0 |
| 2019 | 2856 | 0.0 | 0.0 | 0.0 |
| 2020 | 723 | 0.0 | 0.0 | 0.0 |
For data sources see[6]