If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0766123213000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.626914,"lon":-119.809186,"icon":""}]} |
| Location: 00/13-32-076-12W6/0 | |
| Location Alias: 00/13-32-76-12 W6M | |
| Location Alias 2: 00/13-32-076-12 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 076 | |
| Meridian: 6 | |
| Range: 12 | |
| Section: 32 | |
| County/Municipality: Saddle Hills County | |
| Well Name: AVN HZ GLACIER 13-32-76-12 | |
| Operator Name: Advantage Oil & Gas Ltd. | |
| License Number: 0423819 | |
| License Date: 2010-09-24 | |
| License Status: Amended | |
| Spud Date: 2010-12-28 | |
| Final Drill Date: 2011-01-18 | |
| Well Total Depth: 4098.00 m | |
| Surface Hole Latitude: 55.626914 | |
| Surface Hole Longitude: -119.809186 |
| Date | Event |
|---|---|
| 2010-09-24 | Obtained License |
| 2010-12-30 | Surface Casing Operation Performed |
| 2011-01-03 | Direction Drilling Operation Performed - Horizontal |
| 2011-01-18 | Finished Drilling |
| 2011-01-18 | Well Log Performed |
| 2011-01-18 | Well Mode changed to Drilled and Cased |
| 2011-01-19 | Production Casing Operation Performed |
| 2011-01-20 | Rig Released |
| 2011-02-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-02-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-02-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-02-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-02-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-02-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-02-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-02-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-02-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-05-20 | Well Began Production |
| 2011-05-20 | Well Fluid changed to Gas |
| 2011-05-20 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-01-03 | 1963.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-02-04 | Multi-Stage Fracture | 4075.00 | 4076.00 | 0 |
| 2011-02-06 | Acid Treatment | 3515.00 | 3516.00 | 0 |
| 2011-02-06 | Multi-Stage Fracture | 3375.00 | 3376.00 | 0 |
| 2011-02-06 | Acid Treatment | 3375.00 | 3376.00 | 0 |
| 2011-02-06 | Multi-Stage Fracture | 3235.00 | 3236.00 | 0 |
| 2011-02-06 | Acid Treatment | 3235.00 | 3236.00 | 0 |
| 2011-02-06 | Multi-Stage Fracture | 3095.00 | 3096.00 | 0 |
| 2011-02-06 | Acid Treatment | 3095.00 | 3096.00 | 0 |
| 2011-02-06 | Multi-Stage Fracture | 2955.00 | 2956.00 | 0 |
| 2011-02-07 | Acid Treatment | 2955.00 | 2956.00 | 0 |
| 2011-02-07 | Multi-Stage Fracture | 2815.00 | 2816.00 | 0 |
| 2011-02-04 | Acid Treatment | 4075.00 | 4076.00 | 0 |
| 2011-02-07 | Acid Treatment | 2815.00 | 2816.00 | 0 |
| 2011-02-07 | Multi-Stage Fracture | 2800.00 | 2801.00 | 0 |
| 2011-02-07 | Acid Treatment | 2800.00 | 2801.00 | 0 |
| 2011-02-07 | Multi-Stage Fracture | 2675.00 | 2676.00 | 0 |
| 2011-02-07 | Acid Treatment | 2675.00 | 2676.00 | 0 |
| 2011-02-08 | Multi-Stage Fracture | 2668.00 | 2670.00 | 0 |
| 2011-02-08 | Acid Treatment | 2668.00 | 2670.00 | 0 |
| 2011-02-08 | Multi-Stage Fracture | 2525.00 | 2535.00 | 0 |
| 2011-02-08 | Acid Treatment | 2525.00 | 2535.00 | 0 |
| 2011-02-08 | Multi-Stage Fracture | 2390.00 | 2400.00 | 0 |
| 2011-02-04 | Multi-Stage Fracture | 3935.00 | 3936.00 | 0 |
| 2011-02-08 | Acid Treatment | 2390.00 | 2400.00 | 0 |
| 2011-02-05 | Acid Treatment | 3935.00 | 3936.00 | 0 |
| 2011-02-05 | Multi-Stage Fracture | 3795.00 | 3796.00 | 0 |
| 2011-02-05 | Acid Treatment | 3795.00 | 3796.00 | 0 |
| 2011-02-05 | Multi-Stage Fracture | 3655.00 | 3656.00 | 0 |
| 2011-02-05 | Acid Treatment | 3655.00 | 3656.00 | 0 |
| 2011-02-05 | Multi-Stage Fracture | 3515.00 | 3516.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 5394 | 0.0 | 0.0 | 0.0 |
| 2012 | 8532 | 0.0 | 0.0 | 0.0 |
| 2013 | 8692 | 0.0 | 0.0 | 0.0 |
| 2014 | 8164 | 0.0 | 0.0 | 0.0 |
| 2015 | 6681 | 0.0 | 0.0 | 0.0 |
| 2016 | 7286 | 0.0 | 0.0 | 0.0 |
| 2017 | 8301 | 0.0 | 0.0 | 0.0 |
| 2018 | 7150 | 0.0 | 0.0 | 0.0 |
| 2019 | 6302 | 0.0 | 0.0 | 0.0 |
| 2020 | 2075 | 0.0 | 0.0 | 0.0 |
For data sources see[6]