If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0766130916020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.584048,"lon":-119.962817,"icon":""}]} |
| Location: 02/16-09-076-13W6/0 | |
| Location Alias: 02/16-09-76-13 W6M | |
| Location Alias 2: 02/16-09-076-13 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 076 | |
| Meridian: 6 | |
| Range: 13 | |
| Section: 09 | |
| County/Municipality: Saddle Hills County | |
| Well Name: AVN 102 HZ GLACIER 16-9-76-13 | |
| Operator Name: Advantage Oil & Gas Ltd. | |
| License Number: 0475495 | |
| License Date: 2015-05-12 | |
| License Status: Issued | |
| Spud Date: 2015-08-20 | |
| Final Drill Date: 2015-09-03 | |
| Well Total Depth: 4351.00 m | |
| Surface Hole Latitude: 55.584048 | |
| Surface Hole Longitude: -119.962817 |
| Date | Event |
|---|---|
| 2015-05-12 | Obtained License |
| 2015-08-22 | Surface Casing Operation Performed |
| 2015-08-26 | Direction Drilling Operation Performed - Deviate |
| 2015-08-28 | Direction Drilling Operation Performed - Horizontal |
| 2015-08-29 | Well Log Performed |
| 2015-08-31 | Well Log Performed |
| 2015-09-03 | Finished Drilling |
| 2015-09-03 | Well Log Performed |
| 2015-09-03 | Well Mode changed to Drilled and Cased |
| 2015-09-05 | Production Casing Operation Performed |
| 2015-09-06 | Rig Released |
| 2016-06-28 | Perforation Treatment Performed - Open-Hole Completion |
| 2016-06-28 | Well Log Performed |
| 2016-08-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-08-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-08-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-02-12 | Well Began Production |
| 2017-02-12 | Well Fluid changed to Gas |
| 2017-02-12 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-08-20 | Horizon Drilling Inc. | 30 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-08-26 | 2425.50 | Deviate (5 - 79 degrees) |
| 2015-08-28 | 2753.20 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2016-06-28 | Open Hole/Barefoot Completion | 4313.00 | 4351.00 | 0 |
| 2016-08-03 | Multi-Stage Fracture | 3593.50 | 3593.60 | 0 |
| 2016-08-03 | Multi-Stage Fracture | 3497.70 | 3497.80 | 0 |
| 2016-08-04 | Multi-Stage Fracture | 3414.50 | 3414.60 | 0 |
| 2016-08-04 | Multi-Stage Fracture | 3319.30 | 3319.40 | 0 |
| 2016-08-04 | Multi-Stage Fracture | 3236.10 | 3236.20 | 0 |
| 2016-08-04 | Multi-Stage Fracture | 3140.70 | 3140.80 | 0 |
| 2016-08-04 | Multi-Stage Fracture | 3057.50 | 3057.60 | 0 |
| 2016-08-04 | Multi-Stage Fracture | 2974.80 | 2974.90 | 0 |
| 2016-08-04 | Multi-Stage Fracture | 2879.20 | 2879.30 | 0 |
| 2016-08-02 | Multi-Stage Fracture | 4301.70 | 4301.80 | 0 |
| 2016-08-02 | Multi-Stage Fracture | 4200.80 | 4200.90 | 0 |
| 2016-08-02 | Multi-Stage Fracture | 4117.60 | 4117.70 | 0 |
| 2016-08-02 | Multi-Stage Fracture | 4035.00 | 4035.10 | 0 |
| 2016-08-03 | Multi-Stage Fracture | 3939.20 | 3939.30 | 0 |
| 2016-08-03 | Multi-Stage Fracture | 3855.90 | 3856.00 | 0 |
| 2016-08-03 | Multi-Stage Fracture | 3760.00 | 3760.10 | 0 |
| 2016-08-03 | Multi-Stage Fracture | 3676.80 | 3676.90 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2016-08-02 | 2016-08-04 | 2,658 | 7,871 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 85.6784 | N/A | |||
| Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 7.7976 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 7.7976 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 7.7976 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 7.7975 | N/A | ||||
| Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 3.8988 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 3.8988 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 3.8988 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 3.8988 | N/A | ||||
| Chemcide PT | Canyon Technical Services | Bactericide/Biocide | Methyl Alcohol | 67-56-1 | 100 | 0.0094 | N/A | |
| N-Coco Alkyltrimethylenediamine diacetates | 61791-64-8 | 100 | 0.0094 | N/A | ||||
| CAN-2321 Breaker (Oxidizer Delayed HT) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0041 | N/A | |
| Crystalline silica. quartz | 14808-60-7 | 100 | 0.0041 | N/A | ||||
| CAN-2102 pH Buffer (HpH) | Canyon Technical Services | Buffer | Methyl Alcohol | 67-56-1 | 100 | 0.0398 | N/A | |
| Sodium Hydroxide | 1310-73-2 | 100 | 0.0398 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0398 | N/A | ||||
| CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.1893 | N/A | |
| CAN-2200S Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Monoethanolamine | 141-43-5 | 100 | 0.0338 | N/A | |
| Water | 7732-18-5 | 100 | 0.0338 | N/A | ||||
| Nitrogen Gas | Canyon Technical Services | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 2.1344 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 2.1344 | N/A | ||||
| CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.0673 | N/A | |
| CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0549 | N/A | |
| CAN-2400 Surface Tension Reducer | Canyon Technical Services | Surfactant | Citrus Terpenes | 94266-47-4 | 100 | 0.0919 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0919 | N/A | ||||
| Triethylene Glycol | 112-27-6 | 100 | 0.0919 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2016-07-29 | 2016-08-03 | Surface Water - Lake | 5904 |
| 2016-06-28 | 2016-06-28 | Central Water Distribution Facility | 31 |
| 2016-07-07 | 2016-07-07 | Central Water Distribution Facility | 20 |
| 2016-07-29 | 2016-07-29 | Central Water Distribution Facility | 1528 |
| 2016-07-29 | 2016-08-03 | Municipal Water | 1158 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 7090 | 0.0 | 0.0 | 0.0 |
| 2018 | 8082 | 0.0 | 0.0 | 0.0 |
| 2019 | 7898 | 0.0 | 0.0 | 0.0 |
| 2020 | 2126 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-08-20 | No Incident Encountered | 0.00 | 0.00 |
| 2016-09-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]