If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0766131212030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.579582,"lon":-119.916298,"icon":""}]} |
| Location: 03/12-12-076-13W6/0 | |
| Location Alias: 03/12-12-76-13 W6M | |
| Location Alias 2: 03/12-12-076-13 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 076 | |
| Meridian: 6 | |
| Range: 13 | |
| Section: 12 | |
| County/Municipality: Saddle Hills County | |
| Well Name: AVN 103 HZ PCOUPES 12-12-76-13 | |
| Operator Name: Advantage Oil & Gas Ltd. | |
| License Number: 0480023 | |
| License Date: 2016-08-03 | |
| License Status: Issued | |
| Spud Date: 2016-10-05 | |
| Final Drill Date: 2017-02-25 | |
| Well Total Depth: 4721.00 m | |
| Surface Hole Latitude: 55.579582 | |
| Surface Hole Longitude: -119.916298 |
| Date | Event |
|---|---|
| 2016-08-03 | Obtained License |
| 2016-10-05 | Well Mode changed to Preset |
| 2016-10-08 | Surface Casing Operation Performed |
| 2017-02-20 | Direction Drilling Operation Performed - Deviate |
| 2017-02-21 | Direction Drilling Operation Performed - Horizontal |
| 2017-02-22 | Well Log Performed |
| 2017-02-25 | Finished Drilling |
| 2017-02-25 | Well Log Performed |
| 2017-02-25 | Well Mode changed to Drilled and Cased |
| 2017-02-27 | Production Casing Operation Performed |
| 2017-02-28 | Rig Released |
| 2017-06-26 | Well Log Performed |
| 2017-07-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-07-28 | Perforation Treatment Performed - Open-Hole Completion |
| 2017-07-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-09-26 | Well Began Production |
| 2017-09-26 | Well Fluid changed to Gas |
| 2017-09-26 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2016-10-05 | Predator Drilling Inc. | 10 | N/A | Set Surface |
| 2017-02-18 | Horizon Drilling Inc. | 30 | N/A | Resumption |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-02-20 | 2423.70 | Deviate (5 - 79 degrees) |
| 2017-02-21 | 2705.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-07-28 | Open Hole/Barefoot Completion | 4716.00 | 4721.00 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 3965.00 | 3965.10 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 3871.80 | 3871.90 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 3778.60 | 3778.70 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 3697.90 | 3698.00 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 3617.20 | 3617.30 | 0 |
| 2017-07-29 | Multi-Stage Fracture | 3523.90 | 3524.00 | 0 |
| 2017-07-29 | Multi-Stage Fracture | 3380.10 | 3380.20 | 0 |
| 2017-07-29 | Multi-Stage Fracture | 3286.80 | 3286.90 | 0 |
| 2017-07-29 | Multi-Stage Fracture | 3206.20 | 3206.30 | 0 |
| 2017-07-29 | Multi-Stage Fracture | 3125.70 | 3125.80 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 4692.00 | 4692.10 | 0 |
| 2017-07-29 | Multi-Stage Fracture | 3032.50 | 3032.60 | 0 |
| 2017-07-29 | Multi-Stage Fracture | 2939.20 | 2939.30 | 0 |
| 2017-07-29 | Multi-Stage Fracture | 2845.90 | 2846.00 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 4629.20 | 4629.30 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 4548.60 | 4548.70 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 4430.20 | 4430.30 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 4337.80 | 4337.90 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 4219.20 | 4219.30 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 4126.20 | 4126.30 | 0 |
| 2017-07-28 | Multi-Stage Fracture | 4045.60 | 4045.70 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-07-28 | 2017-07-29 | 2,624 | 6,761 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 80.9243 | N/A | |||
| Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 11.5347 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 11.5347 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 11.5347 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 11.5347 | N/A | ||||
| Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 5.1424 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 5.1424 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 5.1424 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 5.1425 | N/A | ||||
| Chemcide PT | Canyon Technical Services | Bactericide/Biocide | Methyl Alcohol | 67-56-1 | 100 | 0.0087 | N/A | |
| N-Coco Alkyltrimethylenediamine diacetates | 61791-64-8 | 100 | 0.0087 | N/A | ||||
| CAN-2321 Breaker (Oxidizer Delayed HT) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0031 | N/A | |
| Crystalline silica. quartz | 14808-60-7 | 100 | 0.003 | N/A | ||||
| CAN-2102 pH Buffer (HpH) | Canyon Technical Services | Buffer | Methyl Alcohol | 67-56-1 | 100 | 0.0349 | N/A | |
| Sodium Hydroxide | 1310-73-2 | 100 | 0.0349 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0349 | N/A | ||||
| CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.179 | N/A | |
| CAN-2200 Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.0298 | N/A | |
| Monoethanolamine | 141-43-5 | 100 | 0.0298 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0298 | N/A | ||||
| Nitrogen Gas | Canyon Technical Services | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 1.9283 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 1.9282 | N/A | ||||
| CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.0725 | N/A | |
| CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0707 | N/A | |
| nanoFLO 2 | Canyon Technical Services | Surfactant | Refer to MSDS | 1097 | 100 | 0.071 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-06-18 | 2017-06-18 | Central Water Distribution Facility | 35 |
| 2017-06-29 | 2017-07-03 | Surface Water - Lake | 7434 |
| 2017-06-30 | 2017-06-30 | Municipal Water | 1239 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 875 | 0.0 | 0.0 | 0.0 |
| 2018 | 8071 | 0.0 | 0.0 | 0.0 |
| 2019 | 8701 | 0.0 | 0.0 | 0.0 |
| 2020 | 2156 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-10-08 | No Incident Encountered | 0.00 | 0.00 |
| 2017-02-17 | No Incident Encountered | 0.00 | 0.00 |
| 2017-07-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]