If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0774042906F10 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.696372,"lon":-110.594596,"icon":""}]} |
| Location: F1/06-29-077-04W4/0 | |
| Location Alias: F1/06-29-77-04 W4M | |
| Location Alias 2: F1/06-29-077-04 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 077 | |
| Meridian: 4 | |
| Range: 04 | |
| Section: 29 | |
| County/Municipality: Regional Municipality of Wood Buffalo | |
| Well Name: MEG S8 HARDY 6-29-77-4 | |
| Operator Name: MEG Energy Corp. | |
| License Number: 0445371 | |
| License Date: 2012-04-16 | |
| License Status: Issued | |
| Spud Date: 2012-10-23 | |
| Final Drill Date: 2012-10-31 | |
| Well Total Depth: 471.00 m | |
| Surface Hole Latitude: 55.696372 | |
| Surface Hole Longitude: -110.594596 |
| Date | Event |
|---|---|
| 2012-04-16 | Obtained License |
| 2012-10-24 | Direction Drilling Operation Performed - Deviate |
| 2012-10-26 | Plug Back Performed |
| 2012-10-27 | Surface Casing Operation Performed |
| 2012-10-31 | Finished Drilling |
| 2012-10-31 | Well Log Performed |
| 2012-10-31 | Well Mode changed to Drilled and Cased |
| 2012-11-01 | Production Casing Operation Performed |
| 2012-11-02 | Rig Released |
| 2012-11-17 | Perforation Treatment Performed - Jet Perforation |
| 2013-07-01 | Well Began Production |
| 2013-07-01 | Well Fluid changed to Water |
| 2013-07-01 | Well Type changed to Source |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-10-23 | Nabors Drilling Limited | 17 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-10-24 | 34.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-11-17 | Perforation | 409.00 | 420.50 | 26 |
| 2012-11-17 | Perforation | 396.00 | 407.80 | 26 |
| 2012-11-17 | Perforation | 387.00 | 394.80 | 26 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 1854 | 0.0 | 0.0 | 0.0 |
| 2014 | 534 | 0.0 | 0.0 | 0.0 |
| 2015 | 1673 | 0.0 | 0.0 | 0.0 |
| 2016 | 435 | 0.0 | 0.0 | 0.0 |
| 2017 | 919 | 0.0 | 0.0 | 0.0 |
| 2018 | 168 | 0.0 | 0.0 | 0.0 |
| 2019 | 876 | 0.0 | 0.0 | 0.0 |
| 2020 | 9 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-10-31 | No Incident Encountered | 0.00 | 0.00 |
| 2012-11-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]