If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0774052002090 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.669095,"lon":-110.736432,"icon":""}]} |
| Location: 09/02-20-077-05W4/0 | |
| Location Alias: 09/02-20-77-05 W4M | |
| Location Alias 2: 09/02-20-077-05 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 077 | |
| Meridian: 4 | |
| Range: 05 | |
| Section: 20 | |
| County/Municipality: Regional Municipality of Wood Buffalo | |
| Well Name: MEG V4P HARDY 2-20-77-5 | |
| Operator Name: MEG Energy Corp. | |
| License Number: 0438776 | |
| License Date: 2011-11-14 | |
| License Status: Amended | |
| Spud Date: 2012-02-24 | |
| Final Drill Date: 2012-03-04 | |
| Well Total Depth: 1626.00 m | |
| Surface Hole Latitude: 55.669095 | |
| Surface Hole Longitude: -110.736432 |
| Date | Event |
|---|---|
| 2011-11-14 | Obtained License |
| 2011-11-30 | Surface Casing Operation Performed |
| 2012-02-24 | Direction Drilling Operation Performed - Horizontal |
| 2012-02-25 | Intermediate Casing Operation Performed |
| 2012-03-04 | Finished Drilling |
| 2012-03-04 | Well Mode changed to Drilled and Cased |
| 2012-03-05 | Liner Casing Operation Performed |
| 2012-03-05 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-03-05 | Perforation Treatment Performed - Slotted Liner or Casing |
| 2012-03-05 | Rig Released |
| 2012-10-01 | Well Began Production |
| 2012-10-01 | Well Type changed to Steam Assisted Gravity Drain |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-24 | 150.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-03-05 | Slotted Liner | 552.00 | 1605.00 | 0 |
| 2012-03-05 | Open Hole/Barefoot Completion | 1605.00 | 1626.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 6872 | 0.0 | 0.0 | 0.0 |
| 2014 | 8323 | 0.0 | 0.0 | 0.0 |
| 2015 | 8332 | 0.0 | 0.0 | 0.0 |
| 2016 | 8522 | 0.0 | 0.0 | 0.0 |
| 2017 | 8277 | 0.0 | 0.0 | 0.0 |
| 2018 | 7756 | 0.0 | 0.0 | 0.0 |
| 2019 | 8551 | 0.0 | 0.0 | 0.0 |
| 2020 | 2182 | 0.0 | 0.0 | 0.0 |
For data sources see[6]