If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0775210504000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.639707,"lon":-117.207428,"icon":""}]} |
Location: 00/04-05-077-21W5/0 | |
Location Alias: 00/04-05-77-21 W5M | |
Location Alias 2: 00/04-05-077-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 5 | |
Range: 21 | |
Section: 05 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: LONG RUN HZ GVILLEE 4-5-77-21 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0448405 | |
License Date: 2012-09-13 | |
License Status: Suspension | |
Spud Date: 2012-09-21 | |
Final Drill Date: 2012-09-29 | |
Well Total Depth: 2507.00 m | |
Surface Hole Latitude: 55.639707 | |
Surface Hole Longitude: -117.207428 |
Date | Event |
---|---|
2012-09-13 | Obtained License |
2012-09-21 | Surface Casing Operation Performed |
2012-09-22 | Direction Drilling Operation Performed - Deviate |
2012-09-22 | Well Log Performed |
2012-09-24 | Direction Drilling Operation Performed - Horizontal |
2012-09-24 | Well Log Performed |
2012-09-25 | Intermediate Casing Operation Performed |
2012-09-29 | Finished Drilling |
2012-09-29 | Well Log Performed |
2012-09-29 | Well Mode changed to Drilled and Cased |
2012-09-30 | Liner Casing Operation Performed |
2012-10-01 | Rig Released |
2012-10-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-01 | Well Began Production |
2012-11-01 | Well Fluid changed to Crude Oil |
2012-11-01 | Well Mode changed to Pumping |
2018-01-31 | Well Fluid changed to Crude Oil |
2018-01-31 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-21 | Trinidad Drilling Ltd. | 24 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-22 | 575.50 | Deviate (5 - 79 degrees) |
2012-09-24 | 1170.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-24 | Multi-Stage Fracture | 2250.00 | 2250.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 1919.00 | 1919.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 1880.00 | 1880.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 1843.00 | 1843.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 1806.00 | 1806.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 1769.00 | 1769.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 1732.00 | 1732.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 1695.00 | 1695.40 | 0 |
2012-10-25 | Multi-Stage Fracture | 1658.00 | 1658.40 | 0 |
2012-10-25 | Multi-Stage Fracture | 1621.00 | 1621.40 | 0 |
2012-10-25 | Multi-Stage Fracture | 1584.00 | 1584.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 2213.00 | 2213.40 | 0 |
2012-10-25 | Multi-Stage Fracture | 1547.00 | 1547.40 | 0 |
2012-10-25 | Multi-Stage Fracture | 1510.00 | 1510.40 | 0 |
2012-10-25 | Multi-Stage Fracture | 1473.00 | 1473.40 | 0 |
2012-10-25 | Multi-Stage Fracture | 1436.00 | 1436.40 | 0 |
2012-10-25 | Multi-Stage Fracture | 1397.00 | 1397.40 | 0 |
2012-10-25 | Multi-Stage Fracture | 1361.00 | 1361.40 | 0 |
2012-10-25 | Multi-Stage Fracture | 1322.00 | 1322.40 | 0 |
2012-10-25 | Multi-Stage Fracture | 1290.00 | 1290.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 2176.00 | 2176.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 2139.00 | 2139.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 2102.00 | 2102.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 2065.00 | 2065.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 2028.00 | 2028.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 1989.00 | 1989.40 | 0 |
2012-10-24 | Multi-Stage Fracture | 1952.00 | 1952.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1296 | 0.0 | 0.0 | 0.0 |
2013 | 8754 | 0.0 | 0.0 | 0.0 |
2014 | 7893 | 0.0 | 0.0 | 0.0 |
2015 | 8625 | 0.0 | 0.0 | 0.0 |
2016 | 8259 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-01 | No Incident Encountered | 0.00 | 0.00 |
2012-10-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]