If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0775213313000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.724073,"lon":-117.176037,"icon":""}]} |
Location: 00/13-33-077-21W5/0 | |
Location Alias: 00/13-33-77-21 W5M | |
Location Alias 2: 00/13-33-077-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 5 | |
Range: 21 | |
Section: 33 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: LONG RUN HZ ROXANA 13-33-77-21 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0448711 | |
License Date: 2012-09-26 | |
License Status: Issued | |
Spud Date: 2012-09-29 | |
Final Drill Date: 2012-10-05 | |
Well Total Depth: 2679.00 m | |
Surface Hole Latitude: 55.724073 | |
Surface Hole Longitude: -117.176037 |
Date | Event |
---|---|
2012-09-26 | Obtained License |
2012-09-29 | Well Log Performed |
2012-09-30 | Surface Casing Operation Performed |
2012-10-01 | Direction Drilling Operation Performed - Deviate |
2012-10-02 | Direction Drilling Operation Performed - Horizontal |
2012-10-03 | Intermediate Casing Operation Performed |
2012-10-03 | Well Log Performed |
2012-10-05 | Finished Drilling |
2012-10-05 | Well Log Performed |
2012-10-05 | Well Mode changed to Drilled and Cased |
2012-10-06 | Liner Casing Operation Performed |
2012-10-07 | Rig Released |
2012-10-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-18 | Well Began Production |
2012-10-18 | Well Fluid changed to Crude Oil |
2012-10-18 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-29 | Trinidad Drilling Ltd. | 21 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-10-01 | 484.90 | Deviate (5 - 79 degrees) |
2012-10-02 | 1120.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-12 | Multi-Stage Fracture | 2410.00 | 2410.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 2050.00 | 2050.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 2010.00 | 2010.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 1970.00 | 1970.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 1930.00 | 1930.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 1890.00 | 1890.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 1850.00 | 1850.40 | 0 |
2012-10-13 | Multi-Stage Fracture | 1810.00 | 1810.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1770.00 | 1770.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1730.00 | 1730.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1690.00 | 1690.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 2361.00 | 2361.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1650.00 | 1650.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1610.00 | 1610.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1570.00 | 1570.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1530.00 | 1530.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1490.00 | 1490.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1450.00 | 1450.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1410.00 | 1410.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1370.00 | 1370.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1330.00 | 1330.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1290.00 | 1290.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 2330.00 | 2330.40 | 0 |
2012-10-15 | Multi-Stage Fracture | 1250.00 | 1250.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 2285.00 | 2285.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 2250.00 | 2250.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 2211.00 | 2211.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 2165.00 | 2165.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 2130.00 | 2130.40 | 0 |
2012-10-12 | Multi-Stage Fracture | 2090.00 | 2090.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1812 | 0.0 | 0.0 | 0.0 |
2013 | 8609 | 0.0 | 0.0 | 0.0 |
2014 | 8457 | 0.0 | 0.0 | 0.0 |
2015 | 8370 | 0.0 | 0.0 | 0.0 |
2016 | 8588 | 0.0 | 0.0 | 0.0 |
2017 | 8528 | 0.0 | 0.0 | 0.0 |
2018 | 8681 | 0.0 | 0.0 | 0.0 |
2019 | 8464 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-07 | No Incident Encountered | 0.00 | 0.00 |
2012-10-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]