If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0775251114002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.663153,"lon":-117.767935,"icon":""}]} |
| Location: 00/14-11-077-25W5/2 | |
| Location Alias: 00/14-11-77-25 W5M | |
| Location Alias 2: 00/14-11-077-25 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 077 | |
| Meridian: 5 | |
| Range: 25 | |
| Section: 11 | |
| County/Municipality: Birch Hills County | |
| Well Name: CNRL EAGLE 14-11-77-25 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0017502 | |
| License Date: 1959-07-31 | |
| License Status: Suspension | |
| Spud Date: 1959-08-08 | |
| Final Drill Date: 1959-09-22 | |
| Well Total Depth: 2328.40 m | |
| Surface Hole Latitude: 55.663153 | |
| Surface Hole Longitude: -117.767935 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1959-07-31 | Obtained License |
| 1959-08-18 | Drill Stem Test Performed |
| 1959-09-16 | Liner Casing Operation Performed |
| 1959-09-20 | Drill Stem Test Performed |
| 1959-09-22 | Finished Drilling |
| 1959-09-24 | Perforation Treatment Performed - Jet Perforation |
| 1959-11-07 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1959-11-08 | Perforation Treatment Performed - Cement Squeeze |
| 1959-11-15 | Perforation Treatment Performed - Jet Perforation |
| 1968-06-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1968-06-27 | Well Log Performed |
| 1968-07-05 | Perforation Treatment Performed - Selective Jet Perforations |
| 1968-07-06 | Perforation Treatment Performed - Jet Perforation |
| 1968-07-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1968-11-30 | Perforation Treatment Performed - Cement Squeeze |
| 1968-12-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1968-12-01 | Perforation Treatment Performed - Jet Perforation |
| 1968-12-05 | Perforation Treatment Performed - Cement Squeeze |
| 1968-12-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1968-12-06 | Perforation Treatment Performed - Jet Perforation |
| 1968-12-09 | Perforation Treatment Performed - Cement Squeeze |
| 1968-12-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1968-12-10 | Perforation Treatment Performed - Jet Perforation |
| 1973-03-14 | Perforation Treatment Performed - Jet Perforation |
| 1976-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-03-04 | Perforation Treatment Performed - Cement Squeeze |
| 1976-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-03-06 | Perforation Treatment Performed - Jet Perforation |
| 1976-03-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-03-18 | Perforation Treatment Performed - Jet Perforation |
| 1978-07-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1978-07-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1978-07-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1978-07-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-06-16 | Well Mode changed to Drilled and Cased |
| 1992-11-01 | Well Began Production |
| 1992-11-01 | Well Fluid changed to Gas |
| 1992-11-01 | Well Mode changed to Flowing |
| 1995-09-20 | Perforation Treatment Performed - Jet Perforation |
| 1995-09-20 | Well Log Performed |
| 1995-09-21 | Perforation Treatment Performed - Fractured |
| 1995-09-22 | Well Log Performed |
| 2002-11-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2003-01-01 | Well Fluid changed to Gas |
| 2003-01-01 | Well Mode changed to Pumping |
| 2006-11-20 | Well Fluid changed to Gas |
| 2006-11-20 | Well Mode changed to Suspended |
| 2014-10-17 | Well Log Performed |
| 2014-10-21 | Well Log Performed |
| 2014-10-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2014-10-24 | Perforation Treatment Performed - Cement Plug |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1959-09-24 | Perforation | 2297.60 | 2300.60 | 13 |
| 1968-07-07 | Acid Treatment | 1511.80 | 1511.80 | 0 |
| 1968-07-07 | Acid Treatment | 1500.20 | 1506.30 | 0 |
| 1968-11-30 | Cement Squeeze | 1500.20 | 1511.80 | 0 |
| 1968-12-01 | Perforation | 1461.20 | 1466.70 | 7 |
| 1968-12-01 | Acid Treatment | 1461.20 | 1466.70 | 0 |
| 1968-12-01 | Acid Treatment | 1461.20 | 1466.70 | 0 |
| 1968-12-05 | Cement Squeeze | 1461.20 | 1466.70 | 0 |
| 1968-12-06 | Perforation | 1440.50 | 1444.80 | 7 |
| 1968-12-06 | Acid Treatment | 1440.50 | 1444.80 | 0 |
| 1968-12-09 | Cement Squeeze | 1440.50 | 1444.80 | 0 |
| 1959-09-24 | Perforation | 2303.40 | 2307.00 | 13 |
| 1968-12-10 | Perforation | 1366.70 | 1370.40 | 7 |
| 1968-12-10 | Acid Treatment | 1366.70 | 1370.40 | 0 |
| 1973-03-14 | Perforation | 2297.60 | 2300.60 | 13 |
| 1973-03-14 | Perforation | 2303.40 | 2307.00 | 13 |
| 1976-03-04 | Acid Treatment | 2303.40 | 2307.00 | 0 |
| 1976-03-04 | Cement Squeeze | 2303.40 | 2307.00 | 0 |
| 1976-03-06 | Perforation | 2295.10 | 2300.60 | 13 |
| 1976-03-06 | Acid Treatment | 2295.10 | 2300.60 | 0 |
| 1976-03-18 | Perforation | 2302.50 | 2304.00 | 7 |
| 1976-03-18 | Acid Treatment | 2302.50 | 2304.00 | 0 |
| 1959-11-07 | Hydra Jet Perforation | 2312.50 | 2312.50 | 0 |
| 1978-07-17 | Packing Device Capped w/Cement | 2258.60 | 2264.70 | 0 |
| 1978-07-20 | Packing Device Capped w/Cement | 2190.00 | 2197.60 | 0 |
| 1978-07-25 | Acid Treatment | 1366.70 | 1370.40 | 0 |
| 1978-07-29 | Acid Treatment | 1366.70 | 1370.40 | 0 |
| 1995-09-20 | Perforation | 1363.00 | 1370.50 | 18 |
| 1995-09-21 | Fracture | 1363.00 | 1370.50 | 0 |
| 2002-11-10 | Acid Treatment | 1363.00 | 1370.50 | 0 |
| 2014-10-23 | Packing Device Capped w/Cement | 1243.50 | 1251.50 | 0 |
| 2014-10-24 | Cement Plug | 650.00 | 1239.00 | 0 |
| 1959-11-08 | Cement Squeeze | 2312.50 | 2312.50 | 0 |
| 1959-11-15 | Perforation | 2298.80 | 2300.60 | 13 |
| 1959-11-15 | Perforation | 2303.40 | 2307.00 | 13 |
| 1968-06-24 | Packing Device Capped w/Cement | 1674.60 | 1680.10 | 0 |
| 1968-07-05 | Selective Jet Perforations | 1511.80 | 1511.80 | 0 |
| 1968-07-06 | Perforation | 1500.20 | 1506.30 | 3 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1988 | 24 | 0.0 | 0.0 | 0.0 |
| 1992 | 1444 | 0.0 | 0.0 | 0.0 |
| 1993 | 7892 | 0.0 | 0.0 | 0.0 |
| 1994 | 8042 | 0.0 | 0.0 | 0.0 |
| 1995 | 7952 | 0.0 | 0.0 | 0.0 |
| 1996 | 8464 | 0.0 | 0.0 | 0.0 |
| 1997 | 8372 | 0.0 | 0.0 | 0.0 |
| 1998 | 7931 | 0.0 | 0.0 | 0.0 |
| 1999 | 7253 | 0.0 | 0.0 | 0.0 |
| 2000 | 6604 | 0.0 | 0.0 | 0.0 |
| 2001 | 5771 | 0.0 | 0.0 | 0.0 |
| 2002 | 2327 | 0.0 | 0.0 | 0.0 |
| 2003 | 8759 | 0.0 | 0.0 | 0.0 |
| 2004 | 6143 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-10-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]