If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0775252105000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.686284,"lon":-117.828082,"icon":""}]} |
Location: 00/05-21-077-25W5/0 | |
Location Alias: 00/05-21-77-25 W5M | |
Location Alias 2: 00/05-21-077-25 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 5 | |
Range: 25 | |
Section: 21 | |
County/Municipality: Birch Hills County | |
Well Name: CNRL ET AL EAGLE 5-21-77-25 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0093216 | |
License Date: 1981-11-10 | |
License Status: Suspension | |
Spud Date: 1981-11-16 | |
Final Drill Date: 1981-12-12 | |
Well Total Depth: 2660.00 m | |
Surface Hole Latitude: 55.686284 | |
Surface Hole Longitude: -117.828082 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-11-10 | Obtained License |
1981-12-12 | Finished Drilling |
1981-12-13 | Drill Stem Test Performed |
1981-12-14 | Drill Stem Test Performed |
1981-12-15 | Drill Stem Test Performed |
1981-12-19 | Production Casing Operation Performed |
1982-05-23 | Perforation Treatment Performed - Jet Perforation |
1982-05-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-05-27 | Perforation Treatment Performed - Jet Perforation |
1982-05-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-06-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-06-02 | Perforation Treatment Performed - Jet Perforation |
1982-06-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-06-05 | Perforation Treatment Performed - Cement Squeeze |
1982-06-29 | Well Mode changed to Drilled and Cased |
1982-11-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-03-01 | Well Began Injection |
1983-03-01 | Well Fluid changed to Water |
1983-03-01 | Well Type changed to Disposal |
1985-03-07 | Well Log Performed |
1985-03-09 | Perforation Treatment Performed - Jet Perforation |
1985-03-10 | Perforation Treatment Performed - Remedial Casing |
1985-03-19 | Perforation Treatment Performed - Cement Squeeze |
1985-03-19 | Plug Back Performed |
1985-03-19 | Well Fluid changed to Water |
1985-03-19 | Well Mode changed to Abandoned Zone |
1985-03-19 | Well Type changed to Disposal |
1985-03-21 | Well Log Performed |
1985-03-25 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-05-23 | Perforation | 1533.70 | 1535.70 | 7 |
1985-03-09 | Perforation | 918.80 | 919.00 | 0 |
1985-03-10 | Remedial Casing Cementing | 918.80 | 919.00 | 0 |
1985-03-19 | Cement Squeeze | 1533.70 | 1535.70 | 0 |
1985-03-25 | Perforation | 1562.00 | 1564.50 | 7 |
1982-05-24 | Acid Treatment | 1533.70 | 1535.70 | 0 |
1982-05-27 | Perforation | 1562.00 | 1564.50 | 7 |
1982-05-28 | Acid Treatment | 1562.00 | 1564.50 | 0 |
1982-06-01 | Packing Device Capped w/Cement | 1544.00 | 1552.00 | 0 |
1982-06-02 | Perforation | 1400.00 | 1401.00 | 7 |
1982-06-03 | Acid Treatment | 1400.00 | 1401.00 | 0 |
1982-06-05 | Cement Squeeze | 1400.00 | 1401.00 | 0 |
1982-11-18 | Acid Treatment | 1533.70 | 1535.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]