X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776051608000

Well Details

Well ID: 0776051608000
Loading map...
Location: 00/08-16-077-05W6/0
Location Alias: 00/08-16-77-05 W6M
Location Alias 2: 00/08-16-077-05 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 05
Section: 16
County/Municipality: Municipal District of Spirit River No. 133
Well Name: PETRUS RYCROFT 8-16-77-5
Operator Name: Rising Star Resources Ltd.
License Number: 0110668
License Date: 1984-11-09
License Status: Issued
Spud Date: 1984-12-16
Final Drill Date: 1984-12-23
Well Total Depth: 1430.00 m
Surface Hole Latitude: 55.669157
Surface Hole Longitude: -118.704951

For data sources see[1][2]

Well History

Date Event
1984-11-09 Obtained License
1984-12-17 Surface Casing Operation Performed
1984-12-23 Finished Drilling
1984-12-23 Well Log Performed
1984-12-24 Production Casing Operation Performed
1984-12-24 Rig Released
1984-12-24 Well Mode changed to Drilled and Cased
1985-01-08 Well Log Performed
1985-01-20 Well Log Performed
1985-01-22 Perforation Treatment Performed - Jet Perforation
1985-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-29 Well Began Production
1988-05-29 Well Fluid changed to Crude Oil
1988-05-29 Well Mode changed to Pumping
1988-06-15 Well Fluid changed to Crude Oil
1988-06-15 Well Mode changed to Suspended
1988-08-23 Well Log Performed
1988-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-26 Perforation Treatment Performed - Chemical Squeeze
1988-11-01 Well Began Injection
1988-11-01 Well Fluid changed to Water
1988-11-01 Well Type changed to Injection
1992-06-16 Perforation Treatment Performed - Chemical Squeeze
1992-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-22 Perforation Treatment Performed - Chemical Squeeze
1992-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-01-22 Perforation 1365.50 1368.50 13
1985-01-28 Acid Treatment 1365.50 1368.50 0
1988-08-24 Acid Treatment 1365.50 1368.50 0
1988-08-26 Acid Treatment 1365.50 1368.50 0
1988-08-26 Chemical Squeeze 1365.50 1368.50 0
1992-06-16 Chemical Squeeze 1365.50 1368.50 0
1992-07-22 Acid Treatment 1365.50 1368.50 0
1992-07-22 Chemical Squeeze 1365.50 1368.50 0
1992-07-23 Acid Treatment 1365.50 1368.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 71 0.0 0.0 0.0
1987 100 0.0 0.0 0.0
1988 89 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References