If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776051810020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.675189,"lon":-118.757611,"icon":""}]} |
Location: 02/10-18-077-05W6/0 | |
Location Alias: 02/10-18-77-05 W6M | |
Location Alias 2: 02/10-18-077-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 05 | |
Section: 18 | |
County/Municipality: Municipal District of Spirit River No. 133 | |
Well Name: PETRUS RYCROFT 10-18-77-5 | |
Operator Name: Rising Star Resources Ltd. | |
License Number: 0401062 | |
License Date: 2008-09-18 | |
License Status: Suspension | |
Spud Date: 2008-09-28 | |
Final Drill Date: 2008-10-02 | |
Well Total Depth: 1327.00 m | |
Surface Hole Latitude: 55.675189 | |
Surface Hole Longitude: -118.757611 |
Date | Event |
---|---|
2008-09-18 | Obtained License |
2008-09-29 | Surface Casing Operation Performed |
2008-10-02 | Finished Drilling |
2008-10-02 | Well Mode changed to Drilled and Cased |
2008-10-03 | Well Log Performed |
2008-10-04 | Production Casing Operation Performed |
2008-10-04 | Rig Released |
2008-10-09 | Perforation Treatment Performed - Jet Perforation |
2008-10-09 | Well Log Performed |
2008-10-30 | Well Began Production |
2008-10-30 | Well Fluid changed to Gas |
2008-10-30 | Well Mode changed to Flowing |
2009-03-27 | Perforation Treatment Performed - Jet Perforation |
2009-03-27 | Well Log Performed |
2012-04-01 | Well Fluid changed to Gas |
2012-04-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-10-09 | Perforation | 1288.00 | 1289.50 | 17 |
2009-03-27 | Perforation | 1265.00 | 1271.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 878 | 0.0 | 0.0 | 0.0 |
2009 | 252 | 0.0 | 0.0 | 0.0 |
For data sources see[5]