If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776060913004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.661752,"lon":-118.873378,"icon":""}]} |
Location: 00/13-09-077-06W6/4 | |
Location Alias: 00/13-09-77-06 W6M | |
Location Alias 2: 00/13-09-077-06 W6/04 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 06 | |
Section: 09 | |
County/Municipality: Municipal District of Spirit River No. 133 | |
Well Name: WINSLOW VALHALLA 13-9-77-6 | |
Operator Name: Winslow Resources Inc. | |
License Number: 0221657 | |
License Date: 1999-02-22 | |
License Status: Suspension | |
Spud Date: 1999-08-02 | |
Final Drill Date: 1999-08-09 | |
Well Total Depth: 1863.00 m | |
Surface Hole Latitude: 55.661752 | |
Surface Hole Longitude: -118.873378 |
Date | Event |
---|---|
1999-02-22 | Obtained License |
1999-08-03 | Surface Casing Operation Performed |
1999-08-09 | Finished Drilling |
1999-08-09 | Well Mode changed to Drilled and Cased |
1999-08-10 | Drill Stem Test Performed |
1999-08-10 | Well Log Performed |
1999-08-12 | Drill Stem Test Performed |
1999-08-13 | Drill Stem Test Performed |
1999-08-14 | Production Casing Operation Performed |
1999-08-14 | Rig Released |
1999-08-19 | Well Log Performed |
1999-08-20 | Perforation Treatment Performed - Jet Perforation |
1999-08-21 | Perforation Treatment Performed - Fractured |
1999-08-22 | Well Log Performed |
1999-08-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-08-28 | Plug Back Performed |
1999-08-28 | Well Log Performed |
1999-08-29 | Perforation Treatment Performed - Jet Perforation |
1999-08-29 | Well Log Performed |
2005-08-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-08-31 | Perforation Treatment Performed - Cement Squeeze |
2005-09-04 | Perforation Treatment Performed - Jet Perforation |
2005-09-04 | Well Log Performed |
2005-09-06 | Perforation Treatment Performed - Fractured |
2005-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-09-10 | Perforation Treatment Performed - Jet Perforation |
2005-09-10 | Plug Back Performed |
2005-09-10 | Well Log Performed |
2005-09-11 | Perforation Treatment Performed - Fractured |
2008-02-03 | Perforation Treatment Performed - Cement Squeeze |
2008-02-05 | Perforation Treatment Performed - Open-Hole Completion |
2008-03-19 | Well Began Production |
2008-03-19 | Well Fluid changed to Gas |
2008-03-19 | Well Mode changed to Flowing |
2008-12-01 | Well Fluid changed to Gas |
2008-12-01 | Well Mode changed to Suspended |
2014-05-29 | Well Fluid changed to Gas |
2014-05-29 | Well Mode changed to Flowing |
2016-09-23 | Well Fluid changed to Gas |
2016-09-23 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-08-20 | Perforation | 1807.00 | 1810.50 | 18 |
2005-09-10 | Perforation | 1499.00 | 1501.00 | 17 |
2005-09-11 | Fracture | 1499.00 | 1501.00 | 0 |
2008-02-03 | Cement Squeeze | 1499.00 | 1501.00 | 0 |
2008-02-05 | Open Hole/Barefoot Completion | 1591.00 | 1599.00 | 0 |
1999-08-21 | Fracture | 1807.00 | 1810.50 | 0 |
1999-08-28 | Packing Device Capped w/Cement | 1792.00 | 1800.00 | 0 |
1999-08-29 | Perforation | 1296.00 | 1297.00 | 20 |
2005-08-31 | Acid Treatment | 1296.00 | 1297.00 | 0 |
2005-08-31 | Cement Squeeze | 1296.00 | 1297.00 | 0 |
2005-09-04 | Perforation | 1608.00 | 1610.00 | 17 |
2005-09-06 | Fracture | 1608.00 | 1610.00 | 0 |
2005-09-10 | Packing Device Capped w/Cement | 1591.00 | 1599.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 3106 | 0.0 | 0.0 | 0.0 |
2014 | 2831 | 0.0 | 0.0 | 0.0 |
For data sources see[5]