X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776061316002

Well Details

Well ID: 0776061316002
Loading map...
Location: 00/16-13-077-06W6/2
Location Alias: 00/16-13-77-06 W6M
Location Alias 2: 00/16-13-077-06 W6/02
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 06
Section: 13
County/Municipality: Municipal District of Spirit River No. 133
Well Name: PETRUS RYCROFT 16-13-77-6
Operator Name: Rising Star Resources Ltd.
License Number: 0117478
License Date: 1985-09-06
License Status: Issued
Spud Date: 1985-10-13
Final Drill Date: 1985-10-21
Well Total Depth: 1496.00 m
Surface Hole Latitude: 55.678836
Surface Hole Longitude: -118.777152

For data sources see[1][2]

Well History

Date Event
1985-09-06 Obtained License
1985-10-14 Surface Casing Operation Performed
1985-10-21 Finished Drilling
1985-10-21 Well Mode changed to Drilled and Cased
1985-10-22 Well Log Performed
1985-10-23 Drill Stem Test Performed
1985-10-25 Production Casing Operation Performed
1985-10-25 Rig Released
1985-10-29 Well Log Performed
1985-10-31 Well Log Performed
1985-11-01 Perforation Treatment Performed - Jet Perforation
1987-09-19 Perforation Treatment Performed - Jet Perforation
1987-09-19 Well Log Performed
1987-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-25 Perforation Treatment Performed - Jet Perforation
1990-06-26 Well Log Performed
1990-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-28 Perforation Treatment Performed - Chemical Squeeze
1990-07-10 Perforation Treatment Performed - Cement Squeeze
1990-07-16 Perforation Treatment Performed - Jet Perforation
1990-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-17 Well Log Performed
1990-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-01 Well Began Injection
1990-10-01 Well Fluid changed to Water
1990-10-01 Well Type changed to Injection
1992-06-24 Perforation Treatment Performed - Chemical Squeeze
1992-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-11 Perforation Treatment Performed - Jet Perforation
1994-10-11 Well Log Performed
1994-10-19 Perforation Treatment Performed - Jet Perforation
1995-01-03 Well Log Performed
1995-01-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-04 Perforation Treatment Performed - Cement Squeeze
1995-01-11 Perforation Treatment Performed - Jet Perforation
1995-01-11 Well Log Performed
1995-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-16 Well Log Performed
1995-01-17 Perforation Treatment Performed - Cement Squeeze
1995-01-21 Well Fluid changed to Water
1995-01-21 Well Mode changed to Suspended
1995-01-21 Well Type changed to Injection
1995-01-22 Well Fluid changed to Water
1995-01-22 Well Mode changed to Abandoned Zone
1995-01-22 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-01 Perforation 1415.50 1419.20 13
1990-07-16 Perforation 1392.50 1395.50 13
1990-07-16 Perforation 1415.00 1419.30 13
1990-07-16 Perforation 1419.50 1421.00 13
1990-07-16 Perforation 1424.00 1429.00 13
1990-07-17 Acid Treatment 1415.00 1429.00 0
1990-07-18 Acid Treatment 1392.50 1395.50 0
1992-06-24 Chemical Squeeze 1392.50 1429.00 0
1992-06-25 Acid Treatment 1392.50 1429.00 0
1994-10-11 Perforation 1392.50 1395.50 18
1994-10-11 Perforation 1415.50 1420.50 18
1987-09-19 Perforation 1419.30 1421.00 13
1994-10-11 Perforation 1424.50 1428.50 18
1994-10-19 Perforation 1353.80 1354.10 18
1995-01-04 Acid Treatment 1392.50 1395.50 0
1995-01-04 Cement Squeeze 1392.50 1395.50 0
1995-01-11 Perforation 1424.00 1429.00 18
1995-01-13 Acid Treatment 1415.00 1429.00 0
1995-01-17 Cement Squeeze 1392.50 1395.50 0
1987-09-19 Perforation 1424.00 1429.00 13
1987-09-20 Acid Treatment 1415.50 1429.00 0
1987-09-24 Acid Treatment 1415.50 1429.00 0
1990-06-25 Perforation 1392.50 1395.50 13
1990-06-27 Acid Treatment 1392.50 1395.50 0
1990-06-28 Chemical Squeeze 1392.50 1395.50 0
1990-07-10 Cement Squeeze 1392.50 1429.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

References