If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776062506002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.700793,"lon":-118.789853,"icon":""}]} |
Location: 00/06-25-077-06W6/2 | |
Location Alias: 00/06-25-77-06 W6M | |
Location Alias 2: 00/06-25-077-06 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 06 | |
Section: 25 | |
County/Municipality: Municipal District of Spirit River No. 133 | |
Well Name: PETRUS RYCROFT 6-25-77-6 | |
Operator Name: Rising Star Resources Ltd. | |
License Number: 0112507 | |
License Date: 1985-01-15 | |
License Status: Suspension | |
Spud Date: 1985-04-17 | |
Final Drill Date: 1985-04-25 | |
Well Total Depth: 1485.00 m | |
Surface Hole Latitude: 55.700793 | |
Surface Hole Longitude: -118.789853 |
Date | Event |
---|---|
1985-01-15 | Obtained License |
1985-04-18 | Surface Casing Operation Performed |
1985-04-25 | Finished Drilling |
1985-04-25 | Well Log Performed |
1985-04-25 | Well Mode changed to Drilled and Cased |
1985-04-26 | Drill Stem Test Performed |
1985-04-28 | Production Casing Operation Performed |
1985-04-28 | Rig Released |
1985-05-22 | Well Log Performed |
1985-05-23 | Well Log Performed |
1985-05-24 | Perforation Treatment Performed - Jet Perforation |
1996-04-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-08-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-06-28 | Perforation Treatment Performed - Jet Perforation |
2007-07-03 | Well Began Production |
2007-07-03 | Well Fluid changed to Gas |
2007-07-03 | Well Mode changed to Flowing |
2014-11-30 | Well Fluid changed to Gas |
2014-11-30 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-05-24 | Perforation | 1413.50 | 1418.20 | 13 |
1985-05-24 | Perforation | 1420.50 | 1423.50 | 13 |
1996-04-30 | Acid Treatment | 1413.50 | 1423.50 | 0 |
2000-08-24 | Acid Treatment | 1413.50 | 1418.20 | 0 |
2000-08-24 | Acid Treatment | 1423.00 | 1423.50 | 0 |
2007-06-28 | Perforation | 1287.70 | 1288.20 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 3812 | 0.0 | 0.0 | 0.0 |
2008 | 7519 | 0.0 | 0.0 | 0.0 |
2009 | 89 | 0.0 | 0.0 | 0.0 |
2010 | 5727 | 0.0 | 0.0 | 0.0 |
2011 | 8089 | 0.0 | 0.0 | 0.0 |
2012 | 8276 | 0.0 | 0.0 | 0.0 |
2013 | 7728 | 0.0 | 0.0 | 0.0 |
For data sources see[5]