If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776063107000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.712655,"lon":-118.917309,"icon":""}]} |
Location: 00/07-31-077-06W6/0 | |
Location Alias: 00/07-31-77-06 W6M | |
Location Alias 2: 00/07-31-077-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 06 | |
Section: 31 | |
County/Municipality: Municipal District of Spirit River No. 133 | |
Well Name: TOURMALINE VALHALLA 7-31-77-6 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0394088 | |
License Date: 2008-02-13 | |
License Status: Suspension | |
Spud Date: 2008-02-27 | |
Final Drill Date: 2008-03-05 | |
Well Total Depth: 1608.80 m | |
Surface Hole Latitude: 55.712655 | |
Surface Hole Longitude: -118.917309 |
Date | Event |
---|---|
2008-02-13 | Obtained License |
2008-02-28 | Surface Casing Operation Performed |
2008-03-05 | Finished Drilling |
2008-03-05 | Well Mode changed to Drilled and Cased |
2008-03-06 | Well Log Performed |
2008-03-07 | Production Casing Operation Performed |
2008-03-07 | Rig Released |
2008-05-29 | Perforation Treatment Performed - Jet Perforation |
2008-06-01 | Well Began Production |
2008-06-01 | Well Fluid changed to Crude Oil |
2008-06-01 | Well Mode changed to Flowing |
2008-06-02 | Perforation Treatment Performed - Fractured |
2008-06-07 | Perforation Treatment Performed - Jet Perforation |
2008-06-08 | Perforation Treatment Performed - Fractured |
2008-06-30 | Well Fluid changed to Crude Oil |
2008-06-30 | Well Mode changed to Suspended |
2020-03-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-03-15 | Well Fluid changed to Crude Oil |
2020-03-15 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-05-29 | Perforation | 1542.70 | 1546.70 | 20 |
2008-06-02 | Fracture | 1542.70 | 1546.70 | 0 |
2008-06-07 | Perforation | 1476.20 | 1480.20 | 20 |
2008-06-08 | Fracture | 1476.20 | 1480.20 | 0 |
2020-03-15 | Packing Device Capped w/Cement | 1521.00 | 1529.00 | 0 |
2020-03-15 | Packing Device Capped w/Cement | 1465.00 | 1473.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 50 | 0.0 | 0.0 | 0.0 |
2020 | 72 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-03-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]