X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776070215000

Well Details

Well ID: 0776070215000
Loading map...
Location: 00/15-02-077-07W6/0
Location Alias: 00/15-02-77-07 W6M
Location Alias 2: 00/15-02-077-07 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 07
Section: 02
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 15-2-77-7
Operator Name: Tourmaline Oil Corp.
License Number: 0461990
License Date: 2013-12-05
License Status: Issued
Spud Date: 2014-02-07
Final Drill Date: 2014-02-23
Well Total Depth: 3518.00 m
Surface Hole Latitude: 55.662495
Surface Hole Longitude: -118.990503

For data sources see[1][2]

Well History

Date Event
2013-12-05 Obtained License
2014-02-09 Surface Casing Operation Performed
2014-02-11 Direction Drilling Operation Performed - Deviate
2014-02-13 Direction Drilling Operation Performed - Horizontal
2014-02-14 Well Log Performed
2014-02-15 Intermediate Casing Operation Performed
2014-02-23 Finished Drilling
2014-02-23 Well Mode changed to Drilled and Cased
2014-02-25 Liner Casing Operation Performed
2014-02-26 Rig Released
2014-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2014-04-01 Well Began Production
2014-04-01 Well Fluid changed to Crude Oil
2014-04-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-02-07 Ironhand Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-11 1329.40 Deviate (5 - 79 degrees)
2014-02-13 1784.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-08 Multi-Stage Fracture 3491.30 3491.40 0
2014-03-12 Multi-Stage Fracture 3024.40 3024.50 0
2014-03-12 Multi-Stage Fracture 2966.00 2966.10 0
2014-03-12 Multi-Stage Fracture 2907.70 2907.80 0
2014-03-12 Multi-Stage Fracture 2849.30 2849.40 0
2014-03-12 Multi-Stage Fracture 2790.00 2790.10 0
2014-03-12 Multi-Stage Fracture 2731.60 2731.70 0
2014-03-12 Multi-Stage Fracture 2659.70 2659.80 0
2014-03-12 Multi-Stage Fracture 2587.90 2588.00 0
2014-03-12 Multi-Stage Fracture 2516.10 2516.20 0
2014-03-12 Multi-Stage Fracture 2444.30 2444.40 0
2014-03-08 Acid Treatment 3491.30 3491.40 0
2014-03-13 Multi-Stage Fracture 2372.50 2372.60 0
2014-03-13 Multi-Stage Fracture 2301.00 2301.10 0
2014-03-13 Multi-Stage Fracture 2229.20 2229.30 0
2014-03-13 Multi-Stage Fracture 2157.40 2157.50 0
2014-03-13 Multi-Stage Fracture 2085.70 2085.80 0
2014-03-13 Multi-Stage Fracture 2013.90 2014.00 0
2014-03-13 Multi-Stage Fracture 1942.10 1942.20 0
2014-03-13 Multi-Stage Fracture 1870.30 1870.40 0
2014-03-12 Multi-Stage Fracture 3432.60 3432.70 0
2014-03-12 Multi-Stage Fracture 3374.60 3374.70 0
2014-03-12 Multi-Stage Fracture 3316.30 3316.40 0
2014-03-12 Multi-Stage Fracture 3258.00 3258.10 0
2014-03-12 Multi-Stage Fracture 3199.60 3199.70 0
2014-03-12 Multi-Stage Fracture 3141.20 3141.30 0
2014-03-12 Multi-Stage Fracture 3082.80 3082.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-08 2014-03-13 1,647 4,719 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 85.6046 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 11.3836 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.0371 N/A
SiberProp 16/30 Trican silica crystalline 14808-60-7 100 1.6906 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0163 N/A
dibromoacetonitrile 3252-43-5 100 0.0163 N/A
non-hazardous ingredients Not Available 100 0.0163 N/A
polyethylene glycol 25322-68-3 100 0.0163 N/A
sodium bromide 7647-15-6 100 0.0163 N/A
CC-77 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.0987 N/A
non-hazardous ingredients Not Available 100 0.0987 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0887 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0887 N/A
non-hazardous ingredients Not Available 100 0.0887 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.08 N/A
isopropanol 67-63-0 100 0.08 N/A
methanol 67-56-1 100 0.08 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.08 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.08 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-03-08 2014-03-12 Surface Water - Runoff 4375
2014-03-12 2014-03-13 Surface Water - Runoff 345

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 5138 0.0 0.0 0.0
2015 7099 0.0 0.0 0.0
2016 7974 0.0 0.0 0.0
2017 8242 0.0 0.0 0.0
2018 8267 0.0 0.0 0.0
2019 3972 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-23 No Incident Encountered 0.00 0.00
2014-03-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References