X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776070603000

Well Details

Well ID: 0776070603000
Loading map...
Location: 00/03-06-077-07W6/0
Location Alias: 00/03-06-77-07 W6M
Location Alias 2: 00/03-06-077-07 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 07
Section: 06
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 3-6-77-7
Operator Name: Tourmaline Oil Corp.
License Number: 0484841
License Date: 2017-08-02
License Status: Issued
Spud Date: 2017-08-14
Final Drill Date: 2017-09-05
Well Total Depth: 3406.00 m
Surface Hole Latitude: 55.651999
Surface Hole Longitude: -119.078975

For data sources see[1][2]

Well History

Date Event
2017-08-02 Obtained License
2017-08-15 Surface Casing Operation Performed
2017-08-29 Direction Drilling Operation Performed - Deviate
2017-08-31 Direction Drilling Operation Performed - Horizontal
2017-09-02 Intermediate Casing Operation Performed
2017-09-05 Finished Drilling
2017-09-05 Well Mode changed to Drilled and Cased
2017-09-06 Liner Casing Operation Performed
2017-09-06 Well Log Performed
2017-09-07 Rig Released
2017-10-06 Well Log Performed
2017-10-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-25 Well Began Production
2017-10-25 Well Fluid changed to Crude Oil
2017-10-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-04 Precision Drilling Corporation 226 N/A Resumption
2017-08-14 Precision Drilling Corporation 226 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-08-29 1465.20 Deviate (5 - 79 degrees)
2017-08-31 1998.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-10-12 Multi-Stage Fracture 3383.40 3383.50 0
2017-10-12 Multi-Stage Fracture 2908.20 2908.30 0
2017-10-12 Multi-Stage Fracture 2848.60 2848.70 0
2017-10-12 Multi-Stage Fracture 2801.00 2801.10 0
2017-10-12 Multi-Stage Fracture 2741.50 2741.60 0
2017-10-12 Multi-Stage Fracture 2694.00 2694.10 0
2017-10-12 Multi-Stage Fracture 2634.40 2634.50 0
2017-10-12 Multi-Stage Fracture 2586.60 2586.70 0
2017-10-12 Multi-Stage Fracture 2527.30 2527.40 0
2017-10-12 Multi-Stage Fracture 2479.70 2479.80 0
2017-10-12 Multi-Stage Fracture 2420.60 2420.70 0
2017-10-12 Multi-Stage Fracture 3335.50 3335.60 0
2017-10-12 Multi-Stage Fracture 2372.60 2372.70 0
2017-10-12 Multi-Stage Fracture 2313.60 2313.70 0
2017-10-12 Multi-Stage Fracture 2266.20 2266.30 0
2017-10-12 Multi-Stage Fracture 2218.70 2218.80 0
2017-10-12 Multi-Stage Fracture 2170.50 2170.60 0
2017-10-12 Multi-Stage Fracture 2122.90 2123.00 0
2017-10-12 Multi-Stage Fracture 2075.30 2075.40 0
2017-10-12 Multi-Stage Fracture 3276.00 3276.10 0
2017-10-12 Multi-Stage Fracture 3228.30 3228.40 0
2017-10-12 Multi-Stage Fracture 3169.40 3169.50 0
2017-10-12 Multi-Stage Fracture 3121.90 3122.00 0
2017-10-12 Multi-Stage Fracture 3063.30 3063.40 0
2017-10-12 Multi-Stage Fracture 3015.40 3015.50 0
2017-10-12 Multi-Stage Fracture 2956.20 2956.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-12 2017-10-12 1,820 4,972 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 92.7572 N/A
Prime Plus (40/70) Canyon Technical Services No specific ingredients Not Available 100 2.8994 N/A
Sand (40/70) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 3.8697 N/A
Crystalline silica. quartz 14808-60-7 100 3.8697 N/A
Iron Oxide 1309-37-1 100 3.8697 N/A
Titanium Oxide 13463-67-7 100 3.8697 N/A
Sand (50/140) Canyon Technical Services Aluminum Oxide 1344-28-1 100 0.4837 N/A
Crystalline silica. quartz 14808-60-7 100 0.4837 N/A
Iron Oxide 1309-37-1 100 0.4837 N/A
Titanium Oxide 13463-67-7 100 0.4837 N/A
CC-8 Clay Stabilizer Trican Well Service Clay Control choline chloride 67-48-1 100 0.0958 N/A
non-hazardous ingredients Not Available 100 0.0958 N/A
CAN-2412 Non-emulsifier Canyon Technical Services Demulsifier 1-Hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0871 N/A
Benzenesulfonic acid. dodecyl-.
compd. with 2-aminoethanol (1:1)
26836-07-7 100 0.0871 N/A
Methanol 67-56-1 100 0.0871 N/A
Poly(oxyethelyne. oxypropylene) copolymer. liquids 11/6/9003 100 0.0871 N/A
Water 7732-18-5 100 0.0871 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.0488 N/A
SI-14 Scale Inhibitor Trican Well Service Scale Inhibitor methanol 67-56-1 100 0.0369 N/A
non-hazardous ingredients Not Available 100 0.0369 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-10-12 2017-10-14 Surface Water - Runoff 4000
2017-10-12 2017-10-14 Surface Water - Runoff 900

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1572 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8487 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-05 No Incident Encountered 0.00 0.00
2017-10-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References