X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776073001020

Well Details

Well ID: 0776073001020
Loading map...
Location: 02/01-30-077-07W6/0
Location Alias: 02/01-30-77-07 W6M
Location Alias 2: 02/01-30-077-07 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 07
Section: 30
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ 102 VALHALLA 1-30-77-7
Operator Name: Tourmaline Oil Corp.
License Number: 0448065
License Date: 2012-08-29
License Status: Amended
Spud Date: 2013-09-01
Final Drill Date: 2013-09-14
Well Total Depth: 3578.00 m
Surface Hole Latitude: 55.686836
Surface Hole Longitude: -119.033668

For data sources see[1][2]

Well History

Date Event
2012-08-29 Obtained License
2013-09-03 Surface Casing Operation Performed
2013-09-05 Direction Drilling Operation Performed - Deviate
2013-09-07 Direction Drilling Operation Performed - Horizontal
2013-09-14 Finished Drilling
2013-09-14 Well Mode changed to Drilled and Cased
2013-09-17 Production Casing Operation Performed
2013-09-18 Rig Released
2013-09-27 Well Log Performed
2013-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-18 Well Began Production
2013-10-18 Well Fluid changed to Crude Oil
2013-10-18 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-09-01 Beaver Drilling Ltd. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-09-05 1285.40 Deviate (5 - 79 degrees)
2013-09-07 1732.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-10-01 Multi-Stage Fracture 3552.30 3552.40 0
2013-10-03 Multi-Stage Fracture 2985.60 2985.70 0
2013-10-03 Multi-Stage Fracture 2927.10 2927.20 0
2013-10-04 Multi-Stage Fracture 2868.60 2868.70 0
2013-10-04 Multi-Stage Fracture 2810.10 2810.20 0
2013-10-04 Multi-Stage Fracture 2751.50 2751.60 0
2013-10-04 Multi-Stage Fracture 2693.10 2693.20 0
2013-10-04 Multi-Stage Fracture 2634.50 2634.60 0
2013-10-04 Multi-Stage Fracture 2576.10 2576.20 0
2013-10-04 Multi-Stage Fracture 2517.80 2517.90 0
2013-10-04 Multi-Stage Fracture 2460.00 2460.10 0
2013-10-03 Multi-Stage Fracture 3480.20 3480.30 0
2013-10-04 Multi-Stage Fracture 2401.50 2401.60 0
2013-10-04 Multi-Stage Fracture 2342.90 2343.00 0
2013-10-04 Multi-Stage Fracture 2284.30 2284.40 0
2013-10-04 Multi-Stage Fracture 2225.40 2225.50 0
2013-10-04 Multi-Stage Fracture 2166.90 2167.00 0
2013-10-04 Multi-Stage Fracture 2108.40 2108.50 0
2013-10-04 Multi-Stage Fracture 2050.00 2050.10 0
2013-10-03 Multi-Stage Fracture 3421.80 3421.90 0
2013-10-03 Multi-Stage Fracture 3349.90 3350.00 0
2013-10-03 Multi-Stage Fracture 3291.30 3291.40 0
2013-10-03 Multi-Stage Fracture 3232.60 3232.70 0
2013-10-03 Multi-Stage Fracture 3174.40 3174.50 0
2013-10-03 Multi-Stage Fracture 3116.00 3116.10 0
2013-10-03 Multi-Stage Fracture 3057.40 3057.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-01 2013-10-04 1,600 6,487 N/A
2 2013-10-03 2013-10-04 1,600 0 N/A
3 2013-10-04 2013-10-04 1,600 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 90.5113 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.086 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0993 N/A
Ethoxylated phenolic resin 8300 100 0.1013 N/A
Isobutyl ketone 8300 100 0.0996 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1127 N/A
Organic acid salts 1 8300 100 0.0993 N/A
Organic acid salts 2 8300 100 0.1003 N/A
Organic acid salts 3 8300 100 0.1013 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.1016 N/A
2 16/30 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 3.9328 N/A
16/30 SiberProp Calfrac Quartz 14808-60-7 100 0.9957 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 5.6275 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.7058 N/A
3 15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 1.0109 N/A
Water 7732-18-5 100 1.0109 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-10-01 2013-10-04 Surface Water - Runoff 6487

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1603 0.0 0.0 0.0
2014 7673 0.0 0.0 0.0
2015 8242 0.0 0.0 0.0
2016 8368 0.0 0.0 0.0
2017 8007 0.0 0.0 0.0
2018 3969 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 1655 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-14 No Incident Encountered 0.00 0.00
2013-10-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References