If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0776132514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.67947,"lon":-119.873278,"icon":""}]} |
| Location: 00/14-25-077-13W6/0 | |
| Location Alias: 00/14-25-77-13 W6M | |
| Location Alias 2: 00/14-25-077-13 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 077 | |
| Meridian: 6 | |
| Range: 13 | |
| Section: 25 | |
| County/Municipality: Saddle Hills County | |
| Well Name: KELT EXP PCOUPES 14-25-77-13 | |
| Operator Name: Kelt Exploration Ltd. | |
| License Number: 0471244 | |
| License Date: 2014-11-07 | |
| License Status: Issued | |
| Spud Date: 2014-12-23 | |
| Final Drill Date: 2015-01-19 | |
| Well Total Depth: 5292.00 m | |
| Surface Hole Latitude: 55.679470 | |
| Surface Hole Longitude: -119.873278 |
| Date | Event |
|---|---|
| 2014-11-07 | Obtained License |
| 2014-12-25 | Surface Casing Operation Performed |
| 2015-01-01 | Direction Drilling Operation Performed - Deviate |
| 2015-01-05 | Direction Drilling Operation Performed - Horizontal |
| 2015-01-19 | Finished Drilling |
| 2015-01-19 | Well Mode changed to Drilled and Cased |
| 2015-01-20 | Well Log Performed |
| 2015-01-21 | Well Log Performed |
| 2015-01-24 | Perforation Treatment Performed - Open-Hole Completion |
| 2015-01-24 | Production Casing Operation Performed |
| 2015-01-25 | Rig Released |
| 2015-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-11 | Perforation Treatment Performed - Jet Perforation |
| 2015-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-12 | Well Began Production |
| 2015-03-12 | Well Fluid changed to Gas |
| 2015-03-12 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-12-23 | Beaver Drilling Ltd. | 8 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-01-01 | 2091.40 | Deviate (5 - 79 degrees) |
| 2015-01-05 | 2423.70 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-01-24 | Open Hole/Barefoot Completion | 5288.00 | 5292.00 | 0 |
| 2015-03-07 | Multi-Stage Fracture | 4788.90 | 4789.80 | 0 |
| 2015-03-07 | Multi-Stage Fracture | 4733.60 | 4734.50 | 0 |
| 2015-03-07 | Multi-Stage Fracture | 4656.50 | 4657.40 | 0 |
| 2015-03-07 | Multi-Stage Fracture | 4601.70 | 4602.60 | 0 |
| 2015-03-07 | Multi-Stage Fracture | 4532.80 | 4533.60 | 0 |
| 2015-03-07 | Multi-Stage Fracture | 4477.40 | 4478.20 | 0 |
| 2015-03-07 | Multi-Stage Fracture | 4408.60 | 4409.50 | 0 |
| 2015-03-07 | Multi-Stage Fracture | 4353.80 | 4354.70 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4287.80 | 4288.60 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4220.90 | 4221.80 | 0 |
| 2015-03-06 | Multi-Stage Fracture | 5263.80 | 5265.10 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4155.30 | 4156.20 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4100.60 | 4101.40 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4031.40 | 4032.20 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3975.30 | 3976.20 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3906.00 | 3906.90 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3850.20 | 3851.00 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3780.80 | 3781.60 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 3724.60 | 3725.40 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 3656.40 | 3657.30 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 3600.40 | 3601.30 | 0 |
| 2015-03-06 | Multi-Stage Fracture | 5204.80 | 5205.60 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 3532.00 | 3532.90 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 3476.50 | 3477.40 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 3409.20 | 3410.10 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3340.00 | 3340.90 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3284.90 | 3285.80 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3228.30 | 3229.20 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3158.40 | 3159.20 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3099.30 | 3100.10 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3026.60 | 3027.50 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 2967.50 | 2968.40 | 0 |
| 2015-03-06 | Multi-Stage Fracture | 5149.20 | 5150.10 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 2905.80 | 2906.70 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 2829.70 | 2830.60 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 2767.10 | 2768.00 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 2689.70 | 2690.60 | 0 |
| 2015-03-11 | Perforation | 2548.00 | 2548.50 | 20 |
| 2015-03-11 | Perforation | 2480.00 | 2480.50 | 20 |
| 2015-03-11 | Perforation | 2430.00 | 2430.50 | 20 |
| 2015-03-11 | Multi-Stage Fracture | 2548.00 | 2548.50 | 0 |
| 2015-03-11 | Multi-Stage Fracture | 2480.00 | 2480.50 | 0 |
| 2015-03-11 | Multi-Stage Fracture | 2430.00 | 2430.50 | 0 |
| 2015-03-06 | Multi-Stage Fracture | 5105.70 | 5106.60 | 0 |
| 2015-03-06 | Multi-Stage Fracture | 5037.60 | 5038.50 | 0 |
| 2015-03-06 | Multi-Stage Fracture | 4981.40 | 4982.30 | 0 |
| 2015-03-06 | Multi-Stage Fracture | 4912.90 | 4913.80 | 0 |
| 2015-03-07 | Multi-Stage Fracture | 4844.80 | 4845.70 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-03-06 | 2015-03-11 | 2,313 | 14,763 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 86.4162 | N/A | |||
| Prime Plus (30/50) | Canyon | No specific ingredients | Not Available | 100 | 1.336 | N/A | ||
| Sand (30/50) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 8.0238 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 8.0238 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 8.0238 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 8.0239 | N/A | ||||
| Sand (40/70) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 4.0461 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 4.0461 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 4.0461 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 4.0461 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.024 | N/A | |
| Water | 7732-18-5 | 100 | 0.024 | N/A | ||||
| CAN-1912 Clay Stabilizer (HT) | Canyon | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0594 | N/A | |
| CAN-2411 Non-emulsifier | Canyon | Demulsifier | Ethylene glycol | 107-21-1 | 100 | 0.0444 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0444 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0444 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0498 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-02-11 | 2015-02-11 | Surface Water - Runoff | 3255 |
| 2015-02-11 | 2015-02-11 | Surface Water - Runoff | 1304 |
| 2015-03-10 | 2015-03-11 | Surface Water - Runoff | 1571 |
| 2015-02-11 | 2015-02-12 | Surface Water - Runoff | 6751 |
| 2015-03-06 | 2015-03-10 | Recycled Fracturing Water (treated at well site) | 1752 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 2303 | 0.0 | 0.0 | 0.0 |
| 2016 | 8043 | 0.0 | 0.0 | 0.0 |
| 2017 | 6232 | 0.0 | 0.0 | 0.0 |
| 2018 | 7852 | 0.0 | 0.0 | 0.0 |
| 2019 | 8089 | 0.0 | 0.0 | 0.0 |
| 2020 | 1719 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-01-24 | No Incident Encountered | 0.00 | 0.00 |
| 2015-03-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]