X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0784102712220

Well Details

Well ID: 0784102712220
Location: 22/12-27-078-10W4/0
Location Alias: 22/12-27-78-10 W4M
Location Alias 2: 22/12-27-078-10 W4/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 4
Range: 10
Section: 27
County/Municipality: Lac La Biche County
Well Name: ATH L1N2 LEISMER 12-27-78-10
Operator Name: Athabasca Oil Corporation
License Number: 0475577
License Date: 2015-06-01
License Status: Issued
Spud Date: 2015-08-06
Final Drill Date: 2015-09-10
Well Total Depth: 1531.00 m
Surface Hole Latitude: 55.778291
Surface Hole Longitude: -111.479930

For data sources see[1][2]

Well History

Date Event
2015-06-01 Obtained License
2015-08-06 Lost Circulation Occurred
2015-08-07 Lost Circulation Occurred
2015-08-07 Surface Casing Operation Performed
2015-08-19 Direction Drilling Operation Performed - Deviate
2015-08-19 Direction Drilling Operation Performed - Horizontal
2015-08-20 Well Log Performed
2015-08-21 Intermediate Casing Operation Performed
2015-08-31 Well Log Performed
2015-09-10 Finished Drilling
2015-09-10 Well Log Performed
2015-09-10 Well Mode changed to Drilled and Cased
2015-09-11 Liner Casing Operation Performed
2015-09-11 Perforation Treatment Performed - Open-Hole Completion
2015-09-11 Perforation Treatment Performed - Slotted Liner or Casing
2015-09-11 Rig Released
2016-06-22 Well Began Production
2016-06-22 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-08-06 Precision Drilling Corporation 330 N/A Drill To LD
2015-09-08 Precision Drilling Corporation 330 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-08-19 226.20 Deviate (5 - 79 degrees)
2015-08-19 499.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-11 Slotted Liner 754.90 1522.50 0
2015-09-11 Open Hole/Barefoot Completion 1522.50 1531.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 3103 0.0 0.0 0.0
2017 8688 0.0 0.0 0.0
2018 8313 0.0 0.0 0.0
2019 8467 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-06 Lost Circulation 104.00 131.00
2015-08-07 Lost Circulation 151.00 161.00
2016-06-21 No Incident Encountered 0.00 0.00

For data sources see[8]

References