X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0784152812002

Well Details

Well ID: 0784152812002
Loading map...
Location: 00/12-28-078-15W4/2
Location Alias: 00/12-28-78-15 W4M
Location Alias 2: 00/12-28-078-15 W4/02
Country: Canada
Province: Alberta
Township: 078
Meridian: 4
Range: 15
Section: 28
County/Municipality: Lac La Biche County
Well Name: FMEL PORTAGE 12-28-78-15
Operator Name: Point Loma Resources Ltd.
License Number: 0142217
License Date: 1989-12-18
License Status: Amended
Spud Date: 1990-02-03
Final Drill Date: 1990-02-09
Well Total Depth: 496.20 m
Surface Hole Latitude: 55.789025
Surface Hole Longitude: -112.277453

For data sources see[1][2]

Well History

Date Event
1989-12-18 Obtained License
1990-02-04 Surface Casing Operation Performed
1990-02-07 Well Log Performed
1990-02-08 Perforation Treatment Performed - Open-Hole Completion
1990-02-08 Production Casing Operation Performed
1990-02-09 Drill Stem Test Performed
1990-02-09 Finished Drilling
1990-02-09 Well Log Performed
1990-02-09 Well Mode changed to Drilled and Cased
1990-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-02-10 Plug Back Performed
1990-02-10 Rig Released
1990-02-25 Perforation Treatment Performed - Jet Perforation
1990-02-25 Well Log Performed
1997-07-17 Well Log Performed
1997-07-18 Well Log Performed
1997-07-20 Perforation Treatment Performed - Open-Hole Completion
1997-12-15 Well Began Injection
1997-12-15 Well Fluid changed to Water
1997-12-15 Well Type changed to Disposal
2013-03-01 Well Fluid changed to Water
2013-03-01 Well Mode changed to Suspended
2013-03-01 Well Type changed to Disposal
2015-08-01 Well Fluid changed to Water
2015-08-01 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-08 Open Hole/Barefoot Completion 476.00 493.00 0
1990-02-10 Packing Device Capped w/Cement 467.50 475.50 0
1990-02-25 Perforation 450.00 453.50 13
1990-02-25 Perforation 455.00 457.00 13
1997-07-20 Open Hole/Barefoot Completion 476.00 496.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[5]

References