If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0785211512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.764857,"lon":-117.154247,"icon":""}]} |
Location: 00/12-15-078-21W5/0 | |
Location Alias: 00/12-15-78-21 W5M | |
Location Alias 2: 00/12-15-078-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 5 | |
Range: 21 | |
Section: 15 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: LONG RUN HZ ROXANA 12-15-78-21 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0449121 | |
License Date: 2012-10-11 | |
License Status: Issued | |
Spud Date: 2012-10-23 | |
Final Drill Date: 2012-10-30 | |
Well Total Depth: 2653.00 m | |
Surface Hole Latitude: 55.764857 | |
Surface Hole Longitude: -117.154247 |
Date | Event |
---|---|
2012-10-11 | Obtained License |
2012-10-24 | Surface Casing Operation Performed |
2012-10-25 | Direction Drilling Operation Performed - Deviate |
2012-10-26 | Direction Drilling Operation Performed - Horizontal |
2012-10-27 | Intermediate Casing Operation Performed |
2012-10-27 | Well Log Performed |
2012-10-30 | Finished Drilling |
2012-10-30 | Well Log Performed |
2012-10-30 | Well Mode changed to Drilled and Cased |
2012-10-31 | Liner Casing Operation Performed |
2012-10-31 | Rig Released |
2012-11-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-12 | Well Began Production |
2012-11-12 | Well Fluid changed to Crude Oil |
2012-11-12 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-10-23 | Trinidad Drilling Ltd. | 21 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-10-25 | 504.90 | Deviate (5 - 79 degrees) |
2012-10-26 | 1119.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-11-09 | Multi-Stage Fracture | 2629.00 | 2629.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 2129.00 | 2129.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 2079.00 | 2079.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 2029.00 | 2029.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1979.00 | 1979.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1929.00 | 1929.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1919.00 | 1919.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1879.00 | 1879.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1829.00 | 1829.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1779.00 | 1779.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1729.00 | 1729.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 2529.00 | 2529.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1679.00 | 1679.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1629.00 | 1629.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1579.00 | 1579.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1529.00 | 1529.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1479.00 | 1479.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1429.00 | 1429.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1379.00 | 1379.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1329.00 | 1329.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1279.00 | 1279.40 | 0 |
2012-11-10 | Multi-Stage Fracture | 1229.00 | 1229.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 2479.00 | 2479.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 2429.00 | 2429.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 2379.00 | 2379.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 2329.00 | 2329.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 2279.00 | 2279.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 2229.00 | 2229.40 | 0 |
2012-11-09 | Multi-Stage Fracture | 2179.00 | 2179.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 950 | 0.0 | 0.0 | 0.0 |
2013 | 8364 | 0.0 | 0.0 | 0.0 |
2014 | 8440 | 0.0 | 0.0 | 0.0 |
2015 | 8718 | 0.0 | 0.0 | 0.0 |
2016 | 8763 | 0.0 | 0.0 | 0.0 |
2017 | 7733 | 0.0 | 0.0 | 0.0 |
2018 | 8340 | 0.0 | 0.0 | 0.0 |
2019 | 8545 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-31 | No Incident Encountered | 0.00 | 0.00 |
2012-11-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]