If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0785212414002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.777908,"lon":-117.119269,"icon":""}]} |
Location: 00/14-24-078-21W5/2 | |
Location Alias: 00/14-24-78-21 W5M | |
Location Alias 2: 00/14-24-078-21 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 5 | |
Range: 21 | |
Section: 24 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: LONG RUN ROXANA 14-24-78-21 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0109741 | |
License Date: 1984-10-05 | |
License Status: Suspension | |
Spud Date: 1984-10-28 | |
Final Drill Date: 1984-11-01 | |
Well Total Depth: 903.00 m | |
Surface Hole Latitude: 55.777908 | |
Surface Hole Longitude: -117.119269 |
Date | Event |
---|---|
1984-10-05 | Obtained License |
1984-10-29 | Surface Casing Operation Performed |
1984-11-01 | Finished Drilling |
1984-11-01 | Well Mode changed to Drilled and Cased |
1984-11-02 | Well Log Performed |
1984-11-05 | Production Casing Operation Performed |
1984-11-05 | Rig Released |
1984-12-02 | Perforation Treatment Performed - Open-Hole Completion |
2005-09-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-09-11 | Plug Back Performed |
2005-09-12 | Perforation Treatment Performed - Jet Perforation |
2005-09-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-09-13 | Perforation Treatment Performed - Jet Perforation |
2005-09-13 | Plug Back Performed |
2005-09-13 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-12-02 | Open Hole/Barefoot Completion | 891.00 | 903.00 | 0 |
2005-09-11 | Packing Device Capped w/Cement | 870.00 | 878.00 | 0 |
2005-09-12 | Perforation | 466.00 | 466.50 | 17 |
2005-09-13 | Packing Device Capped w/Cement | 454.00 | 462.00 | 0 |
2005-09-13 | Perforation | 232.00 | 233.50 | 17 |
2005-09-13 | Perforation | 201.00 | 203.00 | 17 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2005-09-14 | No Incident Encountered | 0.00 | 0.00 |
2017-12-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]