If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786010907002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.74233,"lon":-118.086096,"icon":""}]} |
Location: 00/07-09-078-01W6/2 | |
Location Alias: 00/07-09-78-01 W6M | |
Location Alias 2: 00/07-09-078-01 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 01 | |
Section: 09 | |
County/Municipality: Birch Hills County | |
Well Name: CNRL ET AL BELLOY 7-9-78-1 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0038716 | |
License Date: 1970-09-03 | |
License Status: Abandoned | |
Spud Date: 1970-10-11 | |
Final Drill Date: 1970-10-16 | |
Well Total Depth: 1029.30 m | |
Surface Hole Latitude: 55.742330 | |
Surface Hole Longitude: -118.086096 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1970-09-03 | Obtained License |
1970-10-15 | Drill Stem Test Performed |
1970-10-16 | Finished Drilling |
1970-10-16 | Well Mode changed to Drilled and Cased |
1970-10-17 | Drill Stem Test Performed |
1970-10-18 | Production Casing Operation Performed |
1971-09-06 | Perforation Treatment Performed - Jet Perforation |
1971-09-07 | Perforation Treatment Performed - Jet Perforation |
1971-09-09 | Perforation Treatment Performed - Jet Perforation |
1971-09-10 | Perforation Treatment Performed - Jet Perforation |
1971-09-11 | Perforation Treatment Performed - Cement Squeeze |
1971-09-12 | Perforation Treatment Performed - Cement Squeeze |
1972-11-27 | Well Began Production |
1972-11-27 | Well Fluid changed to Gas |
1972-11-27 | Well Mode changed to Flowing |
1973-07-04 | Perforation Treatment Performed - Cement Plug |
1973-07-05 | Perforation Treatment Performed - Jet Perforation |
1973-07-06 | Perforation Treatment Performed - Jet Perforation |
1975-03-07 | Perforation Treatment Performed - Cement Squeeze |
1975-03-07 | Well Fluid changed to Gas |
1975-03-07 | Well Mode changed to Abandoned Zone |
1975-03-09 | Perforation Treatment Performed - Jet Perforation |
1992-06-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-06-30 | Plug Back Performed |
1992-06-30 | Well Log Performed |
1992-07-01 | Perforation Treatment Performed - Jet Perforation |
1998-06-06 | Well Log Performed |
1998-06-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-06-07 | Plug Back Performed |
1998-06-07 | Well Log Performed |
1998-06-08 | Well Log Performed |
1998-06-09 | Perforation Treatment Performed - Jet Perforation |
1998-06-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-06-10 | Well Log Performed |
1998-06-12 | Perforation Treatment Performed - Remedial Casing |
1998-06-14 | Perforation Treatment Performed - Jet Perforation |
1998-06-14 | Well Log Performed |
1998-06-16 | Perforation Treatment Performed - Remedial Casing |
1999-05-26 | Well Log Performed |
1999-05-28 | Perforation Treatment Performed - Jet Perforation |
1999-05-28 | Well Log Performed |
1999-05-29 | Well Log Performed |
1999-06-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-06-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-06-03 | Well Log Performed |
1999-06-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-04 | Perforation Treatment Performed - Jet Perforation |
1999-06-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-06-05 | Well Log Performed |
1999-06-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-06-06 | Perforation Treatment Performed - Jet Perforation |
1999-06-07 | Perforation Treatment Performed - Cement Plug |
1999-06-08 | Well Log Performed |
1999-06-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-06-09 | Perforation Treatment Performed - Jet Perforation |
1999-06-09 | Well Log Performed |
1999-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-11 | Perforation Treatment Performed - Remedial Casing |
1999-06-13 | Perforation Treatment Performed - Jet Perforation |
1999-06-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-06-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-06-14 | Perforation Treatment Performed - Remedial Casing |
1999-06-14 | Well Log Performed |
1999-08-03 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1971-09-06 | Perforation | 990.60 | 992.40 | 13 |
1975-03-07 | Cement Squeeze | 826.00 | 827.50 | 0 |
1975-03-09 | Perforation | 612.00 | 613.30 | 3 |
1992-06-30 | Packing Device Capped w/Cement | 935.00 | 943.00 | 0 |
1992-07-01 | Perforation | 806.20 | 809.20 | 13 |
1998-06-07 | Packing Device Capped w/Cement | 784.00 | 792.00 | 0 |
1998-06-07 | Packing Device Capped w/Cement | 594.00 | 602.00 | 0 |
1998-06-09 | Perforation | 418.50 | 419.50 | 14 |
1998-06-10 | Acid Treatment | 418.50 | 419.50 | 0 |
1998-06-12 | Remedial Casing Cementing | 418.50 | 419.50 | 0 |
1998-06-14 | Perforation | 379.00 | 380.00 | 14 |
1971-09-07 | Perforation | 827.50 | 829.10 | 13 |
1998-06-16 | Remedial Casing Cementing | 379.00 | 380.00 | 0 |
1999-05-28 | Perforation | 806.20 | 809.20 | 13 |
1999-05-28 | Perforation | 612.00 | 613.30 | 3 |
1999-06-01 | Acid Treatment | 806.20 | 809.20 | 0 |
1999-06-02 | Packing Device Capped w/Cement | 796.00 | 804.00 | 0 |
1999-06-03 | Acid Treatment | 612.00 | 613.30 | 0 |
1999-06-04 | Packing Device Capped w/Cement | 592.00 | 600.00 | 0 |
1999-06-04 | Perforation | 529.00 | 530.00 | 14 |
1999-06-04 | Perforation | 556.00 | 557.00 | 14 |
1999-06-05 | Acid Treatment | 529.00 | 557.00 | 0 |
1971-09-09 | Perforation | 806.50 | 808.30 | 13 |
1999-06-06 | Acid Treatment | 529.00 | 557.00 | 0 |
1999-06-06 | Perforation | 534.00 | 535.00 | 14 |
1999-06-07 | Cement Plug | 478.00 | 565.70 | 0 |
1999-06-09 | Perforation | 453.50 | 454.50 | 14 |
1999-06-09 | Perforation | 462.50 | 463.50 | 14 |
1999-06-09 | Acid Treatment | 453.50 | 463.50 | 0 |
1999-06-11 | Remedial Casing Cementing | 453.50 | 463.50 | 0 |
1999-06-11 | Packing Device Capped w/Cement | 320.60 | 458.00 | 0 |
1999-06-13 | Perforation | 230.00 | 231.00 | 14 |
1999-06-14 | Acid Treatment | 230.00 | 231.00 | 0 |
1971-09-10 | Perforation | 752.90 | 754.10 | 13 |
1999-06-14 | Remedial Casing Cementing | 230.00 | 231.00 | 0 |
1999-06-14 | Packing Device Capped w/Cement | 218.00 | 227.00 | 0 |
1971-09-11 | Cement Squeeze | 806.50 | 808.30 | 0 |
1971-09-12 | Cement Squeeze | 752.90 | 754.10 | 0 |
1973-07-04 | Cement Plug | 973.50 | 981.50 | 0 |
1973-07-05 | Perforation | 950.70 | 951.90 | 7 |
1973-07-06 | Perforation | 953.40 | 954.90 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1972 | 433 | 0.0 | 0.0 | 0.0 |
1973 | 5341 | 0.0 | 0.0 | 0.0 |
1974 | 494 | 0.0 | 0.0 | 0.0 |
For data sources see[5]